Osisko Development Reveals Optimistic Results for Cariboo Project

Osisko Development Unveils Positive Bulk Tonnage Results for Cariboo
Osisko Development Corp. (NYSE: ODV, TSXV: ODV) recently shared positive results regarding ore sorting tests at their Cariboo Gold Project. This innovative project, spanning over 186,740 hectares, showcases the potential for significant gold recovery, enhancing the prospects of the company’s mining endeavors in Canada.
Highlights of the Ore Sorting Test Program
The highlights from the test program are promising, particularly with respect to the X-ray transmission (XRT) ore sorter. Key outcomes included:
- Success with XRT Technology: A sample weighing approximately 80 tonnes underwent successful sorting, achieving a waste rejection rate of 42-55% alongside commendable gold recovery rates ranging between 84-89%.
- Innovative Size Fraction Results: The previously unassessed 6–10 mm particle size now demonstrates a significant opportunity, yielding a 59% waste rejection rate and achieving impressive gold recovery at 92%.
- Enhanced Data Quality: The recent findings build on a larger dataset compared to prior projects, where testing was primarily conducted on smaller sample sizes from drill core.
- Flow Optimization Considerations: Results from the sorting are expected to play a pivotal role in optimizing the ore processing flowsheet, enhancing future recoveries.
Understanding the Testing Process
The conducted program was managed in collaboration with the Saskatchewan Research Council (SRC), utilizing advanced sorting technology from TOMRA. The methodology included segregation of material into various size fractions—fines, mid-size, and oversize—facilitating comprehensive analysis.
Methodologies That Deliver
- Testing in Phases: The test strategy employed a cascade approach, systematically altering sorter settings to balance mass pull and recovery levels effectively.
- AI Integration: Recent advancements in AI technology executed by TOMRA improved material assessment, allowing for optimized sorting strategies based on size and density.
The combination of large sample sizes and advanced methodologies provides a clearer picture of the ore's characteristics, enhancing the accuracy of predictions regarding gold recovery rates.
Next Steps for Osisko Development
The results reveal a need for further investigation into optimizing the Cariboo project's operational efficiencies. Future assessments will consider flow sheet adjustments and variability studies to ensure robust recovery strategies are in place.
Commitment to Quality Control
Osisko Development maintains a strict quality assurance and control process throughout testing, with analyses performed on each size fraction to guarantee precision and reliability in results.
About the Cariboo Gold Project
The Cariboo Gold Project is a significant endeavor situated within the historic Wells-Barkerville mining area. With existing mineral reserves comprising 2.07 million ounces of gold and robust resource estimations, this site represents a major asset for Osisko Development.
Management is optimistic about the potential held in the gold recovery enhancements provided through recent testing. The combination of supportive recent findings and the project’s shovel-ready status solidifies Osisko's path toward future gold production.
Frequently Asked Questions
What are the primary results from the recent ore sorting tests?
The recent tests revealed high gold recovery rates of up to 92% for the 6-10 mm size fraction and overall waste rejection rates of 42-55%.
How does the XRT technology improve gold recovery?
XRT technology effectively separates high-density mineralized material from waste, leading to more efficient processing with lower costs.
What next steps is Osisko Development planning?
Osisko intends to focus on flow sheet optimization and conduct variability studies to enhance gold recovery further.
Where is the Cariboo Gold Project located?
The project is situated in central British Columbia, renowned for its historical mining activity and gold potential.
Who is responsible for overseeing the technical aspects of the project?
The project’s technical aspects are overseen by qualified professionals who ensure compliance with industry standards and regulations.
About The Author
Contact Riley Hayes privately here. Or send an email with ATTN: Riley Hayes as the subject to contact@investorshangout.com.
About Investors Hangout
Investors Hangout is a leading online stock forum for financial discussion and learning, offering a wide range of free tools and resources. It draws in traders of all levels, who exchange market knowledge, investigate trading tactics, and keep an eye on industry developments in real time. Featuring financial articles, stock message boards, quotes, charts, company profiles, and live news updates. Through cooperative learning and a wealth of informational resources, it helps users from novices creating their first portfolios to experts honing their techniques. Join Investors Hangout today: https://investorshangout.com/
The content of this article is based on factual, publicly available information and does not represent legal, financial, or investment advice. Investors Hangout does not offer financial advice, and the author is not a licensed financial advisor. Consult a qualified advisor before making any financial or investment decisions based on this article. This article should not be considered advice to purchase, sell, or hold any securities or other investments. If any of the material provided here is inaccurate, please contact us for corrections.