Q2 Metals Unveils Promising Lithium Drilling Results at Cisco Project

Exciting Drill Results at the Cisco Lithium Project
Highlights
- Drill hole CS25-044 identified three spodumene pegmatite intervals, featuring an impressive continuous segment of 457.4 metres, alongside an additional interval of 36.9 metres.
- Drill hole CS25-038 reported 22 spodumene pegmatite occurrences, including a robust 58.9 metre wide section, plus additional 58.3 metre and 31.8 metre intervals.
- Drill hole CS25-039 exhibited 13 spodumene pegmatite segments, highlighted by a 108.5 metre wide interval together with further intervals of 99.7 metres, 77.7 metres, and 71.0 metres.
- Drill hole CS25-040 yielded 12 intervals of spodumene pegmatite, featuring a 95.1 metre segment, along with widths of 81.9 metres and 66.5 metres.
- A cumulative total of 46 drill holes, amounting to 20,138 metres, have been drilled across the Cisco Project, with results from eight recent holes awaited.
- Three drill rigs are actively engaged on the project, focusing on refining the understanding of the main mineralized zone as the team prepares for an initial inferred Mineral Resource estimate.
From the bustling environment of Vancouver, Canadian mineral exploration company Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458) has announced groundbreaking results from their latest drilling campaign at the Cisco Lithium Project. These encouraging findings come from the summer camp of 2025, where significant continuity and thickness of spodumene pegmatite were recorded.
During the summer drill campaign, which started in mid-June, a total of 4,603 metres were drilled over eight holes, all successfully revealing visual indicators of spodumene mineralization. The most remarkable discovery was observed in hole 44, which encountered an incredible 457-metre intercept, surpassing all expectations. With the mineralized zone extending deeper and along the strike, there is a genuine prospect for further expansion.
Neil McCallum, Q2 Metals' Vice President of Exploration, remarked, "The robust performance shown in Hole 44 showcases the mineralized zone's potential. Our exploration team is strategizing a comprehensive drilling approach for the upcoming fall and winter phases, with the aim to solidify our estimates for the inferred mineral resource."
Alicia Milne, President and CEO of Q2 Metals, emphasized how the results from this summer's drilling campaign are enhancing their understanding of the Cisco mineralized zone. She noted, "The consistency and scale of the spodumene-bearing pegmatite intercepted thus far strongly indicate robust long-term potential. With our solid financial standing, we are ready to proceed confidently with our drilling initiatives to extract the full value of Cisco."
Summary of Drilling Intervals
The detailed mineralized intervals from drill holes CS25-038 to CS25-045 illustrate the depth and breadth of spodumene occurrences:
- Cautionary remarks stress that the pegmatite presence alone does not guarantee lithium mineralization; only assays confirm actual mineral content.
The Q2 geological team has already processed the core from holes CS25-038 to CS25-045, with samples dispatched to SGS Canada for rigorous mineral analysis aimed at verifying lithium presence.
Future Prospects of the Cisco Project
The Cisco Project spans an impressive mineralization zone of approximately 1.5 kilometres in a northeast-southwest direction. An exploration target, crafted in partnership with independent consultant BBA Inc, identified a potential range of mineralization between 215 to 329 million tonnes, with lithium grades estimated between 1.0 and 1.38% Li2O based on initial drilling results.
It's important to note that this exploration target relies on existing geological data and is purely conceptual. Although promising, it is not an official mineral resource, and ongoing exploration may or may not yield results aligning with expectations.
Q2 Metals is actively working to refine the geological models as new data comes in, striving to tighten drill spacing and assess additional areas with enhanced geophysical targeting.
Sampling and Quality Control Protocols
Q2 employs state-of-the-art diamond drilling methods utilizing NQ sized core. Substantial quality assurance protocols, including the consistent integration of blanks and certified reference materials, ensure accurate results and uphold industry standards.
Upcoming Events
Looking ahead, Q2 Metals has scheduled a site tour at the Cisco Project and will be attending several key mining conferences:
Conference/Event | Location | Date |
121 Mining Investment | Hong Kong | September 24 - 25, 2025 |
Investissement Quebec | South Korea & Japan | September 29 – October 3, 2025 |
The Hidden Gems Conference | New York, NY | October 20 – 21, 2025 |
IMARC | Sydney, Australia | October 21 – 23, 2025 |
XPLOR | Montreal QC | October 27 – 30, 2025 |
About Q2 Metals Corp.
Founded on excellence in mineral exploration, Q2 Metals focuses on the Cisco Lithium Project, strategically located within the Eeyou Istchee territory of Quebec. The project comprises over 801 claims across 41,253 hectares, featuring substantial infrastructure access, just 6.5 km from the Billy Diamond Highway. With its remarkable district-scale potential, the Cisco Project is set to be a prominent contender in the multi-billion dollar lithium market.
As Q2 Metals continues its focus on exploration and resource estimation, the company is equipped and eager to unlock the Cisco Project's true value. Interested parties can easily reach out for more information:
FOR FURTHER INFORMATION, PLEASE CONTACT:
Alicia Milne President & CEO Alicia@Q2metals.com |
Jason McBride Investor Relations Manager Jason@Q2metals.com |
Chris Ackerman Corporate Development Chris@Q2metals.com |
Telephone: 1 (800) 482-7560 E-mail: info@Q2metals.com |
Frequently Asked Questions
What is the significance of the drilling results at the Cisco Project?
The recent drilling results at the Cisco Project indicate substantial spodumene pegmatite intervals, highlighting the project's potential for lithium resource development.
How many holes have been drilled on the Cisco Project?
To date, a total of 46 holes have been drilled across the Cisco Project, amounting to 20,138 metres.
What can we expect moving forward for Q2 Metals?
Q2 Metals plans to continue its drilling program with a focus on refining mineral resource estimates while exploring additional areas of interest.
What is the company's strategy for the future?
Q2 Metals aims to leverage its financial resources to advance the exploration of the Cisco Lithium Project, optimizing for future value extraction.
How can investors get in touch with Q2 Metals?
Interested investors can contact Q2 Metals directly via email or visit their website for more information about ongoing activities and opportunities.
About The Author
Contact Riley Hayes privately here. Or send an email with ATTN: Riley Hayes as the subject to contact@investorshangout.com.
About Investors Hangout
Investors Hangout is a leading online stock forum for financial discussion and learning, offering a wide range of free tools and resources. It draws in traders of all levels, who exchange market knowledge, investigate trading tactics, and keep an eye on industry developments in real time. Featuring financial articles, stock message boards, quotes, charts, company profiles, and live news updates. Through cooperative learning and a wealth of informational resources, it helps users from novices creating their first portfolios to experts honing their techniques. Join Investors Hangout today: https://investorshangout.com/
The content of this article is based on factual, publicly available information and does not represent legal, financial, or investment advice. Investors Hangout does not offer financial advice, and the author is not a licensed financial advisor. Consult a qualified advisor before making any financial or investment decisions based on this article. This article should not be considered advice to purchase, sell, or hold any securities or other investments. If any of the material provided here is inaccurate, please contact us for corrections.