Waiting on 5 phase master design of solar complex
Post# of 13178
paying someone working in a closet on some 3D model of a master design for the next super "one stop" shop for all of your solar needs...turnkey facility.
remember medrecycler facility promotion was never enough? it turned into a pyrolysis franchise concept to go nationwide (those 19 other states allowing the unproven process never happened), before adding mobile 18-wheeler Medmaster recycling vehicles (never happened) to the plan.
remember Australia had to be a 6 feedstock promotion (never happened)...not just one to get out of the gate?
remember those promoted Atlas Transit Solution solar bus shelters (never happened) that had to be beefed up with all the bells and whistles with phone chargers, free wifi and screens showing weather alerts etc?
we'll be looking back at the more recent alabama solar panel plant promo tweets in the same way we're reading those 2019-2022 tweets. watching the same bad movie over and over.
in my humble opinion
cheers