Dude I'm glad you have all of this info. But like I stated in a previous post I'm an automation engineer I do this for a living. I called the factory. Like I stated before I've done my home work. LSA stands for line shift average = 10000. Most manufacturing companies use a 70 to 80% goal to determine their LSA.
100% capability is 14,500. That means with minimum down time due to malfunction it can average up to 14,500. Batch changes only take minutes. It's a matter of scanning in a different batch and expectation date. To their laser marking system.
(0)
(0)
Hangover Joe's Holding Corporation (HJOE) Stock Research Links