I really cannot answer that question. I know the first building had a floor poured back in March in preparation for the vault but beyond that I really could not say. If the town building inspector was being quoted accurately in September, the buildings were empty/non-operational. Things may have changed since then, I really don't know. They press release everything why not that?
(0)
(0)
Creative Edge Nutrition Inc. (FITX) Stock Research Links