Gravity Tests Indicate 87% to 96% Gold Recovery at Golden Predator's 3 Aces Project
Filing Services Canada - Thu Sep 04, 8:34AM CDT
Gravity Tests Indicate 87% to 96% Gold Recovery at Golden Predators 3 Aces Project Edmonton, Alberta (FSCwire) - Golden Predator Mining Corp. (TSX.V: GPY) (the Company) announces that results from Gravity Recoverable Gold (GRG) tests done on three samples from the three Aces project in the Yukon Territory have returned GRG recoveries of 86.9 to 95.8%. The GRG testing was completed on three 20-kg sub-samples taken from three larger volume samples collected at the three Aces Projects Sleeping Giant Zone for metallurgical and mineralogical characterization test work (news release dated July 15, 2014). The three samples will now be processed in their entirety in bulk fashion to measure total gold recovery from each of the 600 to 800 kg samples. To view this table, please either click on the link below, or copy and paste the link into your browser: Prior to the GRG tests, SGS Canada Inc. completed screen metallic assays on three 2-kg sub-samples split from the larger volume samples. The screen metallic assays compare very well with the GRG tests and indicate that routine large pulp (approximately 2-kg at minus 10 mesh) screen metallic assays should provide reliable assays going forward in exploration and delineation of the high-grade coarse gold mineralization at the 3 Aces project. To view this table, please either click on the link below, or copy and paste the link into your browser: In 2013 GPY collected 3 samples, 842 kg, 800 kg and 620, kg from the hanging wall portion of the Sleeping Giant vein zone. The samples were shipped via truck to SGS Canada Inc. Laboratories in Burnaby, British Columbia and stored in a secure location. All three samples were collected in areas that were previously channel sampled, and the areas were selected in order to obtain samples from areas with low, medium and high gold values. The characterization test work is being carried out by SGS Canada Inc. in Burnaby, British Columbia. The remaining material from each large sample is now being processed for total gold recovery with gravity methods and processed in bulk fashion. A representative split from the tails of each sample will be subjected to test for identification of additional gold recovery by traditional mineral process techniques by grinding the tails to 75 microns and leaching with cyanide. Results from the processing of the complete large samples should be available in the fourth quarter of 2014. 3 Aces Project, Yukon The 3 Aces property consists of 1,108 contiguous quartz claims (23,000 hectares) located in southeast Yukon. The property is located along the Nahanni Range Road which accesses the operational Cantung Mine located 40 kilometres to the north. The 3 Aces property contains a number of quartz veins and vein zones that cut Cambrian aged limestone, shale, quartz grits and pebble chert conglomerates of the Hyland Group. Previous sampling and exploration by Golden Predator (formerly Northern Tiger) has outlined extensive gold-in-soil anomalies over nine square kilometres, including numerous high-grade gold showings (see property map below) . The 3 Aces property is located in the traditional territory of the Kaska Nation. In January 2013, Golden Predator signed an Exploration Agreement with the Kaska Nation, as represented by the Ross River Dena Council and the Liard First Nation, with respect to activities within their traditional territories. Mr. Mike Maslowski, CPG, a Qualified Person as defined by National Instrument 43-101 and a consultant for the Company, has reviewed, verified and approved disclosure of the technical information contained in this news release. To view this image, please either click on the link below, or copy and paste the link into your browser: Golden Predator Mining Corp. Golden Predators corporate mandate is to advance the Brewery Creek project towards production through a joint venture arrangement. The Brewery Creek mine operated from 1996 to 2002, before closing due to low gold prices. Mining licenses and permits are in place for continued exploration along with a Socio Economic Accord with the Tr'ondek Hwech'in. The Company holds additional projects with current resources and/or new discovery potential, including the high-grade 3 Aces and Grew Creek gold projects and the Marg and Clear Lake polymetallic massive sulfide deposits. For additional information: Greg Hayes, Chief Executive Officer (587) 524 1599 or William M. Sheriff, Co-Chair (208) 635 5415 info@goldenpredator.com (mailto:info@goldenpredator.com) www.goldenpredator.com (http://www.goldenpredator.com) Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties that could cause actual results and the Companys plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, the Company assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change. To view this press release as a PDF file, click onto the following link: http://www.fscwire.com/sites/default/files/ne...042014.pdf Source: Golden Predator Mining Corp (TSX Venture:GPY) http://www.goldenpredator.com Maximum News Dissemination by FSCwire. http://www.fscwire.com Copyright(C)2014 Filing Services Canada Inc.
Gravity Tests Indicate 87% to 96% Gold Recovery at Golden Predator’s 3 Aces Project
Filing Services Canada XHTML - Thu Sep 04, 8:34AM CDT
Golden Predator Leases the Castle West Property, Nevada
Filing Services Canada XHTML - Mon Aug 25, 10:57AM CDT
Preliminary Economic Assessment on Brewery Creek Project, Yukon Commissioned by Golden Predator
Filing Services Canada XHTML - Tue Aug 05, 7:31AM CDT
Golden Predator Commences Preliminary Metallurgical Characterization Tests at 3 Aces Project, Yukon
Filing Services Canada - Tue Jul 15, 10:38AM CDT
Golden Predator Commences Preliminary Metallurgical Characterization Tests at 3 Aces Project, Yukon Edmonton, Alberta (FSCwire) - Golden Predator Mining Corp. (TSX.V: GPY) (the Company) announces that metallurgical and mineralogical characterization test work has commenced on 3 large volume samples collected from the Sleeping Giant zone on the 3 Aces property in the Yukon Territory. The 3 Aces project has areas such as the Sleeping Giant zone that contain high grade gold values with abundant visible and coarse gold. These metallurgical tests will provide Golden Predator information on the coarse gold particle size distribution and other parameters to enable them to design proper sampling and assaying techniques to accurately account for the coarse gold nugget effect in future exploration programs. The test work also includes gravity recoverable gold tests which will indicate the materials amenability for simple gravity recovery methods. Metallurgical Sampling In 2013 GPY collected 3 large samples, each approximately 800 kg, from the hanging wall portion of the Sleeping Giant vein zone. The apparent hanging wall contact of the Sleeping Giant vein zone is exposed as a dip slope on the property and in order to obtain more information concerning the distribution of gold mineralization within the vein, the areas were drilled and blasted with small controlled blasts. The drilled and blasted areas were about 2 m by 3 m along the dip slope and 1 m deep (into the vein). The blasted material was then collected by hand and placed into 1 ton poly ore bags. The bags were sealed with numbered security straps and flown by helicopter to a nearby flat deck truck. The samples were shipped via truck to SGS Canada Inc. Laboratories in Burnaby, British Columbia and stored in a secure location. The sample locations are spread out along about 140 m of strike length. Samples 1 and 2 were collected from the Mesa outcrop area and sample 3 was collected from the 2012 Trench 1 area about 100 m south of the Mesa outcrop. All three samples were collected in areas that were previously channel sampled and the areas were selected in order to obtain samples from areas with low, medium and high gold values. Selected channel sample results adjacent or close to the three metallurgical sample sites are shown in the table below. Table 1: Select Channel Sample Results from Metallurgical Sample Locations To view this table, please either click on the link below, or copy and paste the link into your browser: *Previously released in August 8, 2012 Press Release by Northern Tiger Resources. The characterization test work is being carried out by SGS Canada Inc. laboratory in Burnaby, British Columbia and is designed to begin developing understandings of the physical occurrence of the gold in the vein material, to establish a preferred assay sample size and method, and to begin metallurgical characterization of the coarse gold bearing material. The samples will be stage crushed by SGS Canada Inc. to -10 and -20 mesh. A 2,000 gram test charge from each sample will be split out and submitted for gold and silver analysis by screen metallic method. A sub-sample from one of the three large samples will be submitted for a gold deportment study. The gold deportment study will consist of gold speciation and quantification of all gold minerals, their size distribution, liberation characteristics and association with other minerals. Additionally a 20-kg sub-sample from each of the large samples will be submitted for E-GRG testing (Gravity Recoverable Gold) to determine the materials amenability to gravity concentration as a function of size distribution. The remaining material from each large sample may be submitted for total gold recovery with gravity methods and processed in bulk fashion depending on the results from the earlier test work. If one or more samples are processed in bulk, a representative split from the tails of each sample will be subjected to test for identification of additional gold recovery by traditional mineral process techniques by grinding the tails to 75 microns and leaching with cyanide. Results from the phase I program which includes the screen metallic assays, gold deportment study and gravity recoverable gold test should be completed by mid to late August. 3 Aces Project, Yukon The 3 Aces property consists of 1,108 contiguous quartz claims (23,000 ha) located in southeast Yukon. The property is located along the Nahanni Range Road which accesses the operational Cantung Mine located 40 km to the north. The 3 Aces property contains a number of quartz veins and vein zones that cut Cambrian aged limestone, shale, quartz grits and pebble chert conglomerates of the Hyland Group. Previous sampling and exploration by Golden Predator (formerly Northern Tiger) has outlined extensive gold-in-soil anomalies over nine square kilometres, including numerous high grade gold showings (see property map below) . The 3 Aces property is located in the traditional territory of the Kaska Nation. In January 2013, Golden Predator signed an Exploration Agreement with the Kaska Nation, as represented by the Ross River Dena Council and the Liard First Nation, with respect to activities within their traditional territories. To view this image, please either click on the link below, or copy and paste the link into your browser: To view this image, please either click on the link below, or copy and paste the link into your browser: Golden Predator Mining Corp. Golden Predators corporate mandate is to advance the Brewery Creek project towards production through a joint venture arrangement. In 2013, the Brewery Creek project established an updated oxide resource estimate of 14.1 million Indicated tonnes at an average grade of 1.27 g/t Au for 577,000 ounces and 9.3 million Inferred tonnes at an average grade of 0.94 g/t Au for 269,000 ounces. Resources were estimated with an average oxide cutoff grade of approximately 0.50 g/t Au as disclosed in a NI 43-101 technical report filed on SEDAR(1). The Brewery Creek mine operated from 1996 to 2002, before closing due to low gold prices. Mining licenses and permits are in place for continued exploration along with a Socio Economic Accord with the Tr'ondek Hwech'in. The Company holds additional projects with current resources and/or new discovery potential, including the high grade 3Aces and Grew Creek gold projects and the Marg & Clear Lake polymetallic massive sulfide deposits. Mr. Mike Maslowski, CPG, a Qualified Person as defined by National Instrument 43-101 and a consultant for the Company, has reviewed, verified and approved disclosure of the technical information contained in this news release. For additional information: Greg Hayes, Chief Executive Officer (587) 524 1599 or William M. Sheriff, Co-Chair (208) 635 5415 info@goldenpredator.com (mailto:info@goldenpredator.com) www.goldenpredator.com (http://www.goldenpredator.com) 1)NI 43-101 Technical Report on Resources, Brewery Creek Project, Yukon Territory, Canada by Donald Hulse, P.E., SME-RM, M. Claiborne Newton, III, Ph.D., SME-RM et al. Dated January 2014 filed on SEDAR. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties that could cause actual results and the Companys plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, the Company assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change. To view this press release as a PDF file, click onto the following link: http://www.fscwire.com/sites/default/files/ne...2014_0.pdf Source: Golden Predator Mining Corp (TSX Venture:GPY) http://www.goldenpredator.com Maximum News Dissemination by FSCwire. http://www.fscwire.com Copyright(C)2014 Filing Services Canada Inc.
Golden Predator Announces Former Yukon Premier Dennis Fentie Appointed to the Board of Directors
Filing Services Canada - Thu Jul 10, 8:32AM CDT
Golden Predator Announces Former Yukon Premier Dennis Fentie Appointed to the Board of Directors Edmonton, Alberta (FSCwire) - Golden Predator Mining Corp. (TSX.V: GPY) (the Company) is pleased to announce Mr. Dennis Fentie has joined the Golden Predator Board of Directors. Mr. Dennis Fentie Mr. Fentie served as the Premier of the Yukon from 2002 to 2011, having first entered politics in 1996 as the MLA for Watson Lake. He has represented both the Yukon Party and the New Democratic Party during his tenure. As Premier he also served as Minister of Finance, Minister responsible for devolution, land claims and Yukon Energy Corp. and as the Minister of Environment. Mr. Fentie's priorities included rebuilding the Yukon economy, formalizing relations with First Nations and revitalizing the mining industry. During his tenure the unemployment rate in Yukon declined from 9.8% to approximately 4%, annual mineral exploration expenditures grew from $7 million in 2002 to over $300 million in 2011 and the value of mineral production grew 264 percent. Mr. Fentie currently is a private businessman residing in Watson Lake, Yukon. Working together, the Yukon offers a wealth of opportunity to the mining industry and to the people of the Yukon. It is important to create partnerships in the community, specifically with First Nations to get them more involved in the mining sector, said Mr. Fentie. I look forward to serving with my former colleague Piers McDonald and a great team of Yukoners on the Board. Mr. Fentie joins the current Board of Directors: Blair Shiletto Co-Chair William M. Sheriff Co-Chair Greg Hayes Chief Executive Officer Piers McDonald Jesse Duke Bradley Thiele Mr. Fentie replaces Mr. Toby Pierce on the Board, Mr. Pierce has resigned to pursue personal interests and we thank him for his commitment and years of service. Chief Financial Officer Appointment Mr. Timothy P. Leybold has also replaced Ms. Natasha Tsai as Chief Financial Officer. We thank Ms. Tsai for her service to the Company. Golden Predator Mining Corp. Golden Predators corporate mandate is to advance the Brewery Creek project towards production through a joint venture arrangement. In 2013, the Brewery Creek project established an updated oxide resource estimate of 14.1 million Indicated tonnes at an average grade of 1.27 g/t Au for 577,000 ounces and 9.3 million Inferred tonnes at an average grade of 0.94 g/t Au for 269,000 ounces. Resources were estimated with an average oxide cutoff grade of approximately 0.50 g/t Au as disclosed in a NI 43-101 technical report filed on SEDAR(1). The Brewery Creek mine operated from 1996 to 2002, before closing due to low gold prices. Mining licenses and permits are in place for continued exploration along with a Socio Economic Accord with the Tr'ondek Hwech'in. The Company holds additional projects with current resources and/or new discovery potential, including the high grade 3Aces and Grew Creek gold projects and the Marg & Clear Lake polymetallic massive sulfide deposits. For additional information: Greg Hayes, Chief Executive Officer (587) 524 1599 or William M. Sheriff, Co-Chair (208) 635 5415 info@goldenpredator.com (mailto:info@goldenpredator.com) www.goldenpredator.com (http://www.goldenpredator.com) 1)NI 43-101 Technical Report on Resources, Brewery Creek Project, Yukon Territory, Canada by Donald Hulse, P.E., SME-RM, M. Claiborne Newton, III, Ph.D., SME-RM et al. Dated January 2014 filed on SEDAR. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties that could cause actual results and the Companys plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, the Company assumes no obligation to update forward-looking To view this press release as a PDF file, click onto the following link: http://www.fscwire.com/sites/default/files/ne...102014.pdf Source: Golden Predator Mining Corp (TSX Venture:GPY, TSX Venture:NTR) http://www.goldenpredator.com Maximum News Dissemination by FSCwire. http://www.fscwire.com Copyright(C)2014 Filing Services Canada Inc.
Northern Tiger Resources Announces Share Consolidation
Marketwire - Wed Jan 23, 3:32PM CST
Northern Tiger Resources Inc. ("Company"