Frost line depth in Cleveland, OH and Syracuse, NY
Post# of 56324

Memory serves me correct, the bigger issue was with pouring the concrete in the winter. It came at a premium, but was doable.
If you're talking a massive 3-story hempcrete building...I can only imagine how much foundation that would need.

