Charts are looking good today nice movement. $GPNE The infrastructure in the area is good with access to the site possible throughout the year. The Aukam Graphite deposit is relatively close to a main tar road and well graded so the only construction required would be a ±2 km long access road to site. There is a national power grid that passes right by the property. A link would likely be required. Water is available in large amounts from underground Aquifers (there is an old pump station at the foot of the mountain which was used previously to supply operations with water. The water pump can either be powered through a generator or a wind mill). The nearest rail link is located next to the main highway (some 70 km from site). Suitable areas for tailings dams and flotation plants are available dependent on eventual plant design. The nearest town of Aus is some 87 km away by road. The area is very arid farmland. The owner of Aukam Farm is employed by Exxaro and Glencore at the Rosh Pinah lead and zinc mine. He inherited the farm from his family. He is quite eager to see the project succeed.
(0)
(0)