Posted On: 08/14/2013 4:22:58 PM
Post# of 4018
Re: CutThirdGoose #3454
The copper ore reserves have been verified by THREE independent companies and are there.
I say congrats to those who sold last Oct/Nov when SIRG was over a penny.
The signs of trouble were all there, many just failed to read them. When Buzz reopened the MPO file we should have realized that there would be at least a six month delay that now has turned into over a year!
My wakeup call was when I started researching the leach pad and pond. I asked Rod what the leach time was and never got a response but I did my own research and discovered that it would take at least 3-5 months to get a one acre leach pad loaded and another 3-5 months for the ore to leach. Nords (NRDS) discovered that it was taking over 6 months for their ore to leach! So add it up - 6 months to get the mine ready after funding and permits are done. The add at least 10 months for the leach process and you are into 2015.
I say congrats to those who sold last Oct/Nov when SIRG was over a penny.
The signs of trouble were all there, many just failed to read them. When Buzz reopened the MPO file we should have realized that there would be at least a six month delay that now has turned into over a year!
My wakeup call was when I started researching the leach pad and pond. I asked Rod what the leach time was and never got a response but I did my own research and discovered that it would take at least 3-5 months to get a one acre leach pad loaded and another 3-5 months for the ore to leach. Nords (NRDS) discovered that it was taking over 6 months for their ore to leach! So add it up - 6 months to get the mine ready after funding and permits are done. The add at least 10 months for the leach process and you are into 2015.
(0)
(0)
Scroll down for more posts ▼