(Total Views: 600)
Posted On: 06/18/2025 1:43:50 AM
Post# of 155176
Quote:
We had a transfer of manufacturing capabilities last year to an unknown facility.
Prior to Samsung, leronlimab was being made at a small batch MAB facility in Washington State. I believe they still maintained their FDA authorization for manufacturing so that's probably who we have doing it.

