(Total Views: 510)
Posted On: 01/08/2021 9:44:07 AM
Post# of 145247
Correct. Depends on what boundary is used in the analysis plan, but either <0.001 or <0.005 would have been needed at interim.
![](/m/images/thumb-up.png)
![](/m/images/thumb-down.png)