(Total Views: 464)
Posted On: 04/14/2018 3:41:31 PM
Post# of 96881
Correct me if I'm wrong. It was mentioned in conference that UF 3.0 is ready to be launched once the 21m is completely transfered which is 30-45 days from the conference on March 30. At most early May we should see the fruit of this waiting.
(4)
(0)
Scroll down for more posts ▼