(Total Views: 213)
Posted On: 11/13/2017 11:44:54 AM
Post# of 82676
Re: Roger Wilco #7109
8-k is not necessary.
material events can be included in the 10Q if filed on time, on the 15th (2days away).
That is my undersanding.
IMO
material events can be included in the 10Q if filed on time, on the 15th (2days away).
That is my undersanding.
IMO
(1)
(0)
Scroll down for more posts ▼