Posted On: 06/13/2014 1:37:25 PM
Post# of 41413
NEWS
FROM BALTIA FB PAGE
OPERATIONS UPDATE:
Engines 2 & 3 have been installed on N706BL and
Engines 1 & 4 are being installed today and tomorrow.
FROM BALTIA FB PAGE
OPERATIONS UPDATE:
Engines 2 & 3 have been installed on N706BL and
Engines 1 & 4 are being installed today and tomorrow.
(0)
(0)
#OPERATIONTAKEOUTTHETRASH