could they be talking about mbs? can you mix it wi
Post# of 1536
Deeper contaminated soil and ground water will be treated using a technology that locks the mercury in a mixture of Portland cement and another agent, preventing it from moving into the surrounding soil and ground water. The EPA expects all cleanup work will be completed by fall 2014. The current owner, 26 Railroad Ave, Inc., will be responsible for land use restrictions at the site to ensure that the treated soil and ground water are not disturbed and that no drinking water wells are installed.