The petroleum engineer hired by Santa Fe determined that there should be five (5) wells per drilling location (each, a “Project”) in a layout similar to a dice with points (5) spots with the center location serving as the natural gas injection well and the four corner wells to be production wells. $SFPI
(0)
(0)