What statement was that? Are we talking my Mitchell no 3 estimates based on time and existing tank levels? When the measurement was 7 ft I posted my estimates the other day as follows:
16 hrs/day X 5 days = 80 hours /24 hours or 3 days up and running is the new assumption. 7ft X 12" = 84" of oil X 2 BPD per inch = 168 barrels / 3 days = 56 BPD +/-.
Then Bigsur25 corrected me and he would know the calculation better than I would:
If it made 84 inches in 4800 min. The pro rate goes 84 • 4800 x 1440 x 2 = 50.4 BPD there's 1440 min. In a day . But if the belts were loose we need a new start point to get this right , it's all good