BRZV In March 2012, the Company drilled on Well #6
Post# of 7619
BRZV In March 2012, the Company drilled on Well #6 into the Moran zone. The Company achieved initial production and is currently studying how to increase the oil production.
BRZV In March 2012, the Company drilled on Well #6 into the Moran zone. The Company achieved initial production and is currently studying how to increase the oil production.