huge piles of inventory in CWRN's Baja 14 laydown
Post# of 8054
huge piles of inventory in CWRN's Baja 14 laydown yard-I've lost track of how much inventory-1-3mm were originally 30% of the main processed product of larger than 3mm and 0-1mm were ca 30% of the 0-3mm-so if there was 200k tons of 0-1mmm to be processed by trommel that implies 2.2 MILLION tons of total product-and only 38524 tons plus 36002 tons plus 43829 tons plus 45k tons remaining at port,for a total of 163,355 tons has been trucked.
I thus assume there isnt really 2 million tons of inventory and that the ratio of waste products to that of the main product has changed-CWRN help us out w inventory tonnage! Any guesses how high this pile is?