Investors Hangout Stock Message Boards Logo
  • Mailbox
  • Favorites
  • Boards
    • The Hangout
    • NASDAQ
    • NYSE
    • OTC Markets
    • All Boards
  • Whats Hot!
    • Recent Activity
    • Most Viewed Boards
    • Most Viewed Posts
    • Most Posted
    • Most Followed
    • Top Boards
    • Newest Boards
    • Newest Members
  • Blog
    • Recent Blog Posts
    • Recently Updated
    • News
    • Stocks
    • Crypto
    • Investing
    • Business
    • Markets
    • Economy
    • Real Estate
    • Personal Finance
  • Market Movers
  • Interactive Charts
  • Login - Join Now FREE!
  1. Home ›
  2. Stock Message Boards ›
  3. Stock Boards ›
  4. Strategic Asset Leasing Inc. (LEAS) Message Board

Web Site: www.CuMtn.com TSX: CUM VANCOUVER

Message Board Public Reply | Private Reply | Keep | Replies (1)                   Post New Msg
Edit Msg () | Previous | Next


Post# of 958
Posted On: 04/16/2013 10:34:33 AM
Posted By: mayhem72ss
Re: mayhem72ss #423

Web Site: www.CuMtn.com
TSX: CUM

VANCOUVER, April 16, 2013 /CNW/ - Copper Mountain Mining Corporation (TSX: CUM) (the "Company" or "Copper Mountain") announces production results for the first quarter of 2013 from the Copper Mountain mine located in southern British Columbia.

In the first three months of 2013 the mine shipped 29,400 wmt of concentrate containing approximately 15 million pounds of copper, 5,900 ounces of gold, and 69,000 ounces of silver generating an estimated $62.3 million in gross revenue.

The mine produced 14.2 million pounds of copper, 5,300 ounces of gold, and 64,200 ounces of silver during the first three months of operations in 2013. The mill processed a total of 2.2 million tonnes at an average grade of 0.349 % Copper. Copper production was below the 2013 average guidance but significant mill throughput improvements were achieved in the latter half of March which will enhance the balance of 2013.

Mining activities continued from the Pit 2 and Pit 3 areas on plan and averaged approximately 170,000 tonnes per day. During the quarter a total of 15.5 million tonnes of material was mined, including 4.3 million tonnes of ore and 10.4 million tonnes of waste. The projected life of mine strip ratio is 2 to 1 but higher in the early years.

Mill throughput improved significantly after the scheduled maintenance shutdown in early March. As noted during the year end conference call, the mill achieved a 93.3% availability during February and after a planned shutdown in early March, the mill achieved above budget availability of 92% to the end of the month as compared to an availability of 85.9% averaged during the first quarter. Prior to the shutdown in early March a contractor was engaged to crush a 70,000 tonne sample of our hardest Pit 3 ore to minus two inch. Upon starting up on March 8th the mill treated the finely crushed sample and demonstrated that with pre-crushing the SAG mill can achieve throughput rates above the designed 35,000 tpd. The test confirmed that secondary crushing is an option to pursue to ensure stable and consistent increased long term mill throughput rates for ore from all Pit areas. Immediately following the fine crush sample a test was completed with ore from high intensity blasting and limited supplemental pre crushing. This test also successfully demonstrated increased mill throughput and has provided a path for short term tonnage improvements. Plans are to continue to utilize high intensity blasting that creates more fines in the SAG Mill feed and continue with a contractor to crush up to 10,000 tpd of minus 2inch SAG mill feed. Management will continue to evaluate the pre crush solutions for a final decision as to the long term plan by mid-year.

About Copper Mountain Mining Corporation:
Copper Mountain's flagship asset is the 75% owned Copper Mountain mine located in southern British Columbia near the town of Princeton. The Company has a strategic alliance with Mitsubishi Materials Corporation who owns the remaining 25%. The Copper Mountain mine commenced production in the summer of 2011, and has continued to improve its operations during the year; and attained design capacity in the summer of 2012. The 18,000 acre site has a resource of approximately 5 billion pounds of copper and remains open laterally and at depth. The mine has significant exploration potential that will need to be explored over the next few years to fully appreciate the properties full development potential. Additional information is available on the Company's web page at www.CuMtn.com.

On behalf of the Board of
COPPER MOUNTAIN MINING CORPORATION

"Jim O'Rourke"

Jim O'Rourke, P.Eng.
Chief Executive Officer

Note: This release contains forward-looking statements that involve risks and uncertainties. These statements may differ materially from actual future events or results. Readers are referred to the documents, filed by the Company on SEDAR at www.sedar.com, specifically the most recent reports which identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements. The Company undertakes no obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statement.



SOURCE Copper Mountain Mining Corporation

Copyright 2013 Canada NewsWire


(0)
(0)




Strategic Asset Leasing Inc. (LEAS) Stock Research Links


  1.  
  2.  


  3.  
  4.  
  5.  






Investors Hangout

Home

Mailbox

Message Boards

Favorites

Whats Hot

Blog

Settings

Privacy Policy

Terms and Conditions

Disclaimer

Contact Us

Whats Hot

Recent Activity

Most Viewed Boards

Most Viewed Posts

Most Posted Boards

Most Followed

Top Boards

Newest Boards

Newest Members

Investors Hangout Message Boards

Welcome To Investors Hangout

Stock Message Boards

American Stock Exchange (AMEX)

NASDAQ Stock Exchange (NASDAQ)

New York Stock Exchange (NYSE)

Penny Stocks - (OTC)

User Boards

The Hangout

Private

Global Markets

Australian Securities Exchange (ASX)

Euronext Amsterdam (AMS)

Euronext Brussels (BRU)

Euronext Lisbon (LIS)

Euronext Paris (PAR)

Foreign Exchange (FOREX)

Hong Kong Stock Exchange (HKEX)

London Stock Exchange (LSE)

Milan Stock Exchange (MLSE)

New Zealand Exchange (NZX)

Singapore Stock Exchange (SGX)

Toronto Stock Exchange (TSX)

Contact Investors Hangout

Email Us

Follow Investors Hangout

Twitter

YouTube

Facebook

Market Data powered by QuoteMedia. Copyright © 2025. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges).
Analyst Ratings & Earnings by Zacks. RT=Real-Time, EOD=End of Day, PD=Previous Day. Terms of Use.

© 2025 Copyright Investors Hangout, LLC All Rights Reserved.

Privacy Policy |Do Not Sell My Information | Terms & Conditions | Disclaimer | Help | Contact Us