Massive DD post on GTGP read up and do not miss th
Post# of 2150
There are 4 major things happening with GTGP right now:
1. The acquisition of MSE on, or before 8/15/12
2. The consummation of the first contract with Ash Grove to treat the mercury being emitted at their cement plant. (am expecting a big contract for all of their plants)
3. The "Benchmark", or "Standard" designation from the EPA for the use of MBS to treat the mercury issue at all U.S. cement plants. (Just over 100 U.S. cement plants)(The U.S. plants have 13 months left to comply with the new air standard being enforced by the EPA, and GTGP's MBS is five times better than what is currently being used)
4. The meeting with the Dept. Of Energy at Oak Rdige, TN based on GTGP's certified testing results for treating mercury conaminated soil. There was an award of $2.2 billion to two contractors to finish cleaning up the mess at Oak Ridge, TN. Of that $2.2 billion, 60% is to be sub-contracted out. Neither contractor does mercury remediation so that is one more reason I can see a contract for mercury work at Oak Ridge.