3) Spanish Mountain Gold - XRT ore sorting

New Post Public Reply Private Reply Replies (0) Message Board
solartech
45
3) Spanish Mountain Gold - XRT ore sorting technology

TOMRA XRT ore sorting machine
1259152634_COMXRT2.0TOMRAX-rayoresortingmachine.jpg

TOMRA XRT ore sorting machine at work
1690202644_TOMRAXRToresortingmachineatwork.jpg

This is how XRT ore sorting works: Small pebbles go through XRT gold ore sorting process. Low atomic density pebbles are waste rocks containing no gold and are ejected, high atomic density pebbles containing gold are sent to the ball mill. The ore sorting process results in high gold grade multiple times higher then the unsorted pebbles.

XRT ore sorting principle of operation
https://www.youtube.com/watch?v=5Bio8l240UY

Separating gold pebbles from waste pebbles - High density pebbles fly off the conveyor belt while waste pebbles fall into the drop bin below.

https://www.youtube.com/watch?v=zPJrXyDrGtA

https://www.tomra.com/mining

Tomra Systems ASA is a Norwegian multinational corporation founded in 1972 that specializes in sensor-based collection and sorting technology for the circular economy. 2026 Q3 Revenue is €366 million (US$409 million), up 20% year-on-year. Earnings Before Interest, Taxes, and Amortization (EBITA) for the same quarter reached €47 million (US$52.5 million), a 55% increase from the prior year. Its stock is traded on the Oslo Børs Stock Exchange under the ticker TOM.OL

TOMRA Mining applies X-Ray Transmission (XRT) technology to gold mining primarily as a pre-concentration tool to reject barren waste rock before it reaches energy-intensive grinding and chemical processing mills. Because gold is typically found in exceptionally low concentrations (often just a few grams per ton), XRT sorters do not identify pure gold particles directly. Instead, they scan for atomic density variances to identify host minerals or associated high-density heavy sulfides (like pyrite or arsenopyrite) that typically carry the gold.

How TOMRA XRT Gold Sorting Works

1. Material Preparation: Raw run-of-mine (ROM) ore is crushed and screened into specific particle size ranges, typically ranging from 10mm up to 150mm.

2. XRT Scanning: The material travels along a fast-moving conveyor belt in a single layer. TOMRA’s proprietary DUOLINE® X-ray transmission sensor penetrates each rock, analyzing its internal atomic density regardless of its thickness.

3. AI Classification: Real-time multi-feature image processing and AI platforms, such as TOMRA OBTAIN™ (deep learning-based particle classification) and CONTAIN™ (which detects hidden gold mineralization trapped in host rock), determine within milliseconds which rocks contain gold-bearing sulfides.

4. Precision Air Ejection: High-pressure air valves precisely shoot the targeted gold-bearing rocks into a concentrate stream, while the barren rock (such as low-density quartz or diorite) passes cleanly into a waste pile.

Key Benefits for Gold Operations

• Mass Reduction & Grade Upgrading: By rejecting 30% to 80% of barren waste early on, mines significantly boost the "head grade" of the ore that actually goes into the mill.

• Slashing OPEX: Grinding is the most expensive, power-heavy part of gold mining. Processing fewer total tons translates to major savings in electricity, grinding media, water usage, and cyanide consumption.

• Turning Waste into Profit: At the Kensington Gold Mine in Alaska, TOMRA XRT pebble sorting recovered 4,216 ounces of gold from waste streams in a single year (worth nearly $20 million USD) while creating chemically stable, low-sulfide waste rock that can be repurposed safely as construction aggregate.

Core TOMRA Equipment for Gold Sorters

• TOMRA COM XRT 2.0: A heavy-duty belt-fed sorter built for high throughput and larger particle sizes. It relies on a high-power X-ray system to maximize penetration through dense rocks.

• TOMRA COM Tertiary XRT: Optimized for finer, smaller particle sizes where extreme valve precision and low energy consumption are required to prevent product loss.

• TOMRA Insight: A cloud-connected remote data monitoring platform that pairs with XRT sorters to track throughput, sorting accuracy, and operational health in real-time.

============================================
Update on the progress in XRT ore sorting technology
============================================

Based on the Phase 1 test results released by Spanish Mountain Gold, implementing X-ray transmission (XRT) particle ore sorting technology will eliminate 50% to 70% of the feed mass as waste and lower-grade rock. By successfully rejecting this large portion of subeconomic waste early in the process, the system achieves a two-or-more times increase in the processed gold grade while maintaining an impressive gold recovery rate between 85% and 92%. This pre-concentration step allows the project to move a much richer feed through the plant, significantly reducing the milling capital expenditure, lowering the cost in the floatation circuit and carbon-in-leach circuit, reducing tailings environmental footprint and increasing daily gold production.

On March 2, 2026 Spanish Mountain Gold released positive X-ray transmission (XRT) particle ore sorting results from its Phoenix deposit, significantly boosting process plant feed grades. The upgrade achieved a two-or-more times increase in gold grade through a high mass rejection of waste. The technology successfully upgrades the mill feed grade by over two times while rejecting 50% to 70% of waste rock, maintaining gold recoveries between 85% and 92%. By removing waste early, the company will reduce both the environmental footprint with fewer tailings and will reduce capital expenditure in mine construction.

Following positive Phase 1 results, Phase 2 is evaluating 100-kg bulk samples in parallel with the Main deposit, aimed at optimizing sorting algorithms. The initiative aims to significantly reduce the size of the proposed mill and lower initial capital expenditure (CAPEX) for the project, with results likely to be incorporated into an updated economic assessment in 2026. Partners ABH Engineering Inc. and OrePortal Technologies Ltd. are working on particle and bulk sorting analysis. The company aims to make a construction decision in early 2028 by enhancing project economics through enhanced feed grades. Ore sorting and recent high-grade drilling results are being incorporated into an ongoing Feasibility Study expected to be completed in late 2027 or early 2028, with a mine build decision targeted for early 2028.

March 2, 2026 - Spanish Mountain Gold Receives Positive Particle Ore Sorting Results for the Phoenix Deposit Highlighting Production Upside
https://spanishmountaingold.com/news/2026/spa...on-upside/

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

The XRT ore sorting technology was initiated in late 2025:

October 20, 2025 - Spanish Mountain Gold Initiates X-ray transmission (“XRT”) Ore Sorting Work on Gold Mineralization
https://spanishmountaingold.com/news/2025/spa...alization/

Spanish Mountain Gold Ltd. (“Spanish Mountain” or the “Company”) (TSX-V: SPA; FSE: S3Y; OTCQB: SPAUF) is pleased to announce the commencement of a particle ore sorting program with ABH Engineering Inc. and a bulk ore sorting study with OrePortal Technologies Ltd. ABH previously completed amenability tests on the mineralization from the Main deposit that indicated positive results with X-ray transmission (“XRT”) ore sorting to increase process plant mill feed grades and gold produced while targeting lower costs and improved project economics for the Spanish Mountain Gold (“SMG”) project (see January 21, 2025 news release).

OrePortal will assess if the run of mine mineralized material, prior to crushing, is suitable for ore sorting. If the assessment is successful, a material reduction of the size of the proposed mill and initial capex will be assessed.

President and CEO, Peter Mah, stated, “The amenability of the SMG project gold mineralization to XRT ore sorting is an exciting new opportunity for the project. Ore sorting is anticipated to improve the project scale and economics while derisking portions of the resource, especially lower grade feed. Preconcentrating mineralization essentially moves more gold through the process plant, which could dramatically uplift processed grades, gold production and overall project economics. This initiative is part of a multi-pronged strategy to uplift lower grade portions of the resource and improve gold production during the first ten years of the proposed PEA life of mine. We see this as an important step to complete as we advance the project towards the feasibility study and ultimately a build decision by or in 2027.”

Particle Ore Sorting Studies (ABH)

There are numerous benefits to ore sorting for the SMG project, and it is an important, potential improvement to the run of mine (“ROM”) feed grade of the process plant that could result in higher metal production, lower operating capital per tonne processed, and higher metal recoveries post processing. Particle Ore Sorting can also aid in the rejection of barren material that leads to the reduction of fine tailings, reduced materials handling charges for transportation, reduced process plant and tailings capital expenditures, and ultimately, lower impact to the local receiving environment through reduced water, reagents and overall infrastructure footprint.

The Company is proposing to undertake particle ore sorting test work that will benefit from the results from an earlier study on the Main deposit completed with ABH (see January 21, 2025 news release). The proposed work program will create multiple products and algorithms to determine the optimal sorting conditions for achieving the highest possible increase to gold recovered per tonne milled through the processing plant.

The company is proceeding with sample collection from the historical drill core at the project site. Samples for this testing will be from both Phoenix and Main deposits that provides a more direct comparison of future production results through the evaluation of the particle ore sorting performance under economic assumptions, and it shall include the development of both capital and operating expenditure estimates.

It is anticipated that this important work could find additional gold ounces that could enhance the project economics from the recent PEA (see July 3, 2025 news release). The SMG project can be scalable to meet higher production levels that with the ore sorting will match throughput for the Process Plant.

Bulk Ore Sorting (OrePortal)

The bulk ore sorting study will evaluate its amenability to the SMG project by examining several key factors that include determining the presence of ore heterogeneity. The study will also evaluate what are the preferred sensors for the ore by examining the suitability of the sensor configuration for SMG project. OrePortal employs a desktop study methodology to ascertain if further laboratory work is warranted.

The heterogeneity of the mineralization is studied through the assessment of gold distribution using the 3D block model and assay geochemistry from the recent mineral resource estimate (“MRE”) from the recent PEA (see July 3, 2025 news release). With respect to sensors, XRF and Prompt Gamma Neutron Activation Analysis (“PGNAA”) will be reviewed using suitable models of proxy elements that the sensors can detect to select a suitable model that can be used to classify ore by gold content. Examples of bulk ore sorting systems include bucket mounted XRF sensors or belt-mounted PGNAA sensors affixed to conveyor belt systems.

From the analysis, OrePortal will look to provide estimates of the capital and operating expenditures required and study the impact to the net present value of the project against the recent PEA (see July 3, 2025 news release).

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

ABH Engineering
https://www.abhengineeringinc.com/

ABOUT ABH
ABH Engineering Inc. is a mining engineering company offering geology, mining, and processing services to the mining sector. With key experience in open pit, underground, ore sorting, plant design, and optimization, our team has a passion for delivering maximum value while considering the everchanging landscape of technologies.

Our methods continue to push the boundaries on what is considered the norm for mine design. Mill feed grades can be increased while resources are expanded. Old mines can be re-opened with new, innovative equipment. Tailings ponds can be reduced or eliminated. With the proper application of technology, our team have consistently added over 40% in NPV, prevented the closing of old mines, and kept untold tonnes of CO2 out of the atmosphere, and boosted economics in an environmentally sustainable way.

What is sensor-based ore sorting?

Sensor-based ore sorting is a mineral pre-concentration technology in which particles of material are separated based on some physical or chemical property as measured or inferred by a sensor.

It is used to upgrade process feed by identifying and rejecting waste material early in the mining process which results in pre-concentration of valuable materials into a lower gross volume.

Ore sorting exploits the variability of the orebody, which in many cases is overlooked for higher volumes of feed material.

Types of ore sorting sensors

Several variables are considered when choosing an appropriate sensor for a sorting system. These include, but are not limited to, the ore mineralogy, the ore heterogeneity, the feed method, the throughput rate, and the required accuracy.

This is because different sensors have different depths of penetration, applicable size distributions, abilities to identify versus quantify ore properties and accuracies based on the target material and their specific operating parameters.

Sensing technologies that have been applied in various sensor-based ore sorting processes include:

X-ray transmission (XRT) – classifies ores according to their atomic density

X-ray fluorescence (XRF) – measures elemental abundance based on fluorescence under x-rays

Prompt Gamma Neutron Activation Analysis (PGNAA) and Pulsed Fast Thermal Neutron Activation (PFTNA) – measures elemental abundance based on gamma ray signatures from scattering events.

Color camera – classifies industrial minerals, base- and precious-metal ores or gemstones by colour, reflection, brightness, and transparency

Laser – measures reflection, adsorption, and fluorescence of the laser light on crystal structures

Near-Infrared and Infrared (NIR/IR) – classifies and quantifies ore mineralogy according to their associated reflection, absorption, and transmission spectrum profile

Hyperspectral – classifies ores according to spectral signature across a range of visible, near infrared and short, mid, and long wave infrared bands

Magnetic Resonance (MR) – a form of radiofrequency (RF) spectroscopy that is used for quantitative measurement of target ore minerals

Laser-induced breakdown spectroscopy (LIBS) – detects elemental composition through the analysis of spectral signatures generated from high intensity laser pulses

Electromagnetic (EM) – classifies metals and ores in accordance with their conductivity and permeability.

The system and algorithms that convert the data into information used to make sorting decisions is just as critical as the sensor. Speed, accuracy, resolution, volume limitations, and detection limits of such systems are key considerations that will impact sensor selection.

Depending on where the sensing technology is positioned in the process chain and the capability of the sensor itself, additional process steps may need to be added to present the material in a specific way or divert material after it has been sensed. This includes additional equipment such as grizzlies, feeders, sizers, diverters, and conveyors.

Benefits of sensor-based ore sorting

Primary benefits obtained from ore sorting vary based on individual mine characteristics, but generally result in more metal production at a lower cost and lower environmental footprint.

Benefits may include:

Unlocked plant capacity - through earlier rejection of waste material prior to processing

Increased plant head grade - by replacing rejected waste or low grade with higher grade material in the processing plant

Reduced cost per metal unit produced - through the increase in metal produced due to higher grade feed and the reduction in costs associated with processing waste or lower grade material

Reduced tailings volume - rejecting waste from ore at an early stage allows the mass of fine final tailings to be reduced and the associated storage space

Reduced carbon emissions, water and energy consumption - rejecting waste before the processing plant and upgrading the plant feed means less tonnes of ore treated in the processing plant per ton of product. This results in reduced water usage, energy consumption and subsequent carbon emissions per metal unit produced

Increased mineable reserves - rejecting waste from run of mine ore enables mining with a lower cut-off grade and a corresponding increase in mine life

Reclaimed ore from dumps and low grade stockpiles - bulk ore sorting (or particle sorting) may enable the recovery of valuable components from waste dumps, low-grade stockpiles and marginal reserves that would otherwise be uneconomic to treat

Reduced dilution and ore loss - if applied at the mining face bulk ore sorting can reduce dilution and ore loss

Optimized capital spend - in brownfields operations capital for plant upgrades can be delayed or eliminated. For greenfield operations, plant size can be reduced, or the production rate increased

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Summary

XRT technology (X-Ray Transmission) is expected to lower the capital expenditure (Capex) for Spanish Mountain Gold's project by potentially reducing the size of the proposed mill and initial capex. By sorting ore before it enters the mill, the company can reduce the amount of material that needs to be processed, which could allow for a smaller and less expensive processing plant.

XRT ore sorting reduces operating costs in gold production by separating valuable ore from waste rock early in the process. This process, called pre-concentration, significantly increases the grade of the material sent to the mill. This leads to lower costs in several areas, including less material needing to be mined, transported, crushed, and processed, which in turn decreases energy and water consumption, reagent use, and the amount of fine tailings requiring storage. Ultimately, it results in a higher grade of feed going to the processing plant, improving overall economic potential and reducing the environmental footprint.

Reduced plant size: XRT ore sorting can increase the grade of the mill feed, meaning a smaller mill can process the same amount of gold. A smaller mill would result in lower initial capital costs for construction.

Lower overall plant costs: Besides the initial capital, the technology could also lead to lower overall costs due to a smaller footprint and reduced materials handling.

Future assessment: Spanish Mountain Gold is currently assessing the suitability of their ore for this technology, and a successful assessment could lead to a material reduction in the size of the proposed mill and initial capex.

How XRT ore sorting increases gold grade

Sensor-based separation: XRT sensors analyze the density of rocks as they pass along a conveyor belt. They can identify and differentiate between dense, gold-bearing ore and lighter waste rock.

Targeted ejection: The system uses a high-speed air jet to eject the waste rock or lower-grade ore, while the higher-grade material is sent on to the processing plant.

Pre-concentration: This initial sorting step effectively "pre-concentrates" the ore, meaning that only the material with a higher concentration of gold is sent for further, more expensive milling and processing.

Benefits of using XRT ore sorting

Higher mill feed grade: By removing waste rock, the average grade of the ore fed into the mill increases significantly. For example, tests have shown increases of 39% for gold and 47% for silver.

Lower costs: Processing a smaller volume of higher-grade ore leads to lower processing costs for grinding, flotation, and other stages.

Reduced environmental footprint: Discarding a large portion of waste rock early reduces the amount of tailings, water usage, and energy consumption for the entire operation.

Improved project economics: The combination of higher grade, lower costs, and increased production efficiency can dramatically improve project economics, including increased IRR and faster payback periods.

Increased recovery: While not all gold is recovered in the sorting step, the material that is sorted has a much higher grade, leading to higher overall project recovery rates.

.
.
.

Spanish Mountain Gold Ltd (SPAUF) Stock Research Links

SPAUF Board Company Profile Buy Rating Time & Sales News Filings Financials
Scroll down for more posts ▼

Top 10 Most Recent News Articles

UAE Trust Model Faces Its Hardest Test During Crisis

Updated Category News Views 205

A country’s reputation is usually invisible right up until the machinery rattles. Then people, investors, trading partners and residents stop listening to polished slogans and start watching whether airports function, services hold up, information arrives, and business can keep moving. That was the useful core of Saeed Al Eter’s remarks at Ajman Media Forum 2026: soft...

Continue Reading
Ajman Memory Gives Heritage a Durable Digital Backbone

Updated Category News Views 196

Archives usually get applause only after somebody realizes a piece of history has vanished. Ajman is trying to skip that miserable part. During the Ajman Media Forum 2026, held November 18 and 19 at the Emirates Hospitality Centre, the emirate launched Ajman Memory, a project built to collect, document and preserve photographs, papers and video recording its development....

Continue Reading
D-Wave Investors Face a December 15 Lead Plaintiff Clock

Updated Category News Views 286

August Put the Story Under a Harsh Light Two ugly August trading sessions are doing a lot of work in the case now confronting D-Wave Quantum. The company sits in a field that attracts big dreams, big headlines, and, frankly, plenty of investor imagination. But imagination does not cushion a portfolio when expectations crack. The lawsuits concern people who bought or...

Continue Reading
Persistent Dry Eye Symptoms Call for a Closer Look

Updated Category News Views 207

Eyes can turn into a stubborn little nuisance long before people realize something more complicated is going on. A bottle of artificial tears is easy to grab, cheap enough, and often perfectly sensible for a rough day of screens, wind, reading, or air conditioning. But Dr. Harlan Snyder’s point is the one worth sitting with: when dryness keeps barging back despite...

Continue Reading
PettiChat’s Digital Pet Twin Has Real Consumer Pull

Updated Category News Views 204

A Collar Gadget Is Chasing the Empty-House Problem Leave a dog or cat alone for a few hours and plenty of owners turn into amateur detectives. Did the cat eat? Has the dog been pacing? Why was that one weird noise caught on the home camera? Seattle startup PettiChat is trying to turn that itch into a product category with PettiLive!, a screen-based version of a pet that...

Continue Reading
Newegg’s GIGABYTE Event Is Brand Work, Not a Catalyst

Updated Category News Views 405

A 2,300-square-foot room can tell a retailer plenty about its tribe. On November 21, Newegg is turning its Diamond Bar Gamer Zone into the home base for GIGABYTE’s AORUS VS40 celebration, a free five-hour event marking the hardware maker’s 40th anniversary. There will be 1v1 VALORANT and League of Legends contests, demo stations, raffles, anniversary merchandise, food...

Continue Reading
Sitting, Lymph Flow, and a Supplement Maker's Pitch

Updated Category News Views 193

By late afternoon, a chair can feel like it has quietly won the argument against your legs. PureHealth Research is leaning into that familiar heavy, puffy-legged feeling with a reminder about lymphatic flow—and, naturally, an eight-ingredient supplement positioned alongside it. The broad message is sensible. The sales layer needs the usual healthy squint. Movement Does...

Continue Reading
3TREES Tests a Bigger Asia-Pacific Growth Blueprint

Updated Category News Views 253

A bucket of paint rarely sounds strategic until it sits inside a regional supply chain. That is the useful part of 3TREES chairman and president Hong Jie's message from the Asia-Pacific Economic Cooperation CEO Summit in Shenzhen on November 17-18, 2026: coatings are not merely a commodity if the supplier can bring materials, energy savings, technical know-how and...

Continue Reading
Mission Inn’s Lights Enter a Tender New Ownership Era

Updated Category News Views 330

A holiday spectacle can outlive the hands that hung its first bulb. Riverside is about to test that truth in public, under millions of tiny lights and the very large shadow of a family departure. The Mission Inn Festival of Lights returns in 2026 without Kelly and Duane Roberts as hotel owners for the first time in more than three decades. Duane Roberts died in 2025, the...

Continue Reading
Fluence Investors Face a November 27 Litigation Clock

Updated Category News Views 238

Six calendar squares are all that separate eligible Fluence investors from the November 27, 2026 lead-plaintiff deadline. That is not much time to locate trade confirmations, calculate losses, and decide whether taking a larger role in a securities case makes sense. The lawsuit is not a verdict, and anybody pretending otherwise is selling smoke. But the underlying...

Continue Reading

Top 5 Most Recently Viewed Articles

Elis Capital Structure Overview and Voting Rights Update

Updated Category News Views 292

Elis Capital Structure Overview Elis, a prominent player in the services sector, is committed to providing transparency regarding its capital structure. As of the recent assessment, the company detailed the number of shares that constitute its capital along with the total number of voting rights. Share Capital and Voting Rights According to French legal requirements,...

Continue Reading
A. Walker & Company Secures $50 Million for Housing Projects

Updated Category News Views 244

A. Walker & Company Secures Major Capital Commitments A. Walker & Co. recently secured a significant capital commitment totaling up to $75 million, including an initial $50 million specifically set aside for affordable housing development. This funding is a critical step towards increasing the availability of multifamily housing that can effectively serve the needs of...

Continue Reading
ClorDiSys Enhances Sterilization Capabilities with Expansion

Updated Category News Views 228

ClorDiSys Expands Sterilization Operations ClorDiSys Solutions, LLC has announced a significant expansion in its sterilization facilities, designed to address the growing demand for its chlorine dioxide-based sterilization services. This expansion includes the addition of new chambers, which will effectively double the company’s processing capacity. With the new...

Continue Reading
Star Equity's KBS Builders Secures Major Contracts Worth $5.2M

Updated Category News Views 173

KBS Builders Secures Significant Commercial Contracts Star Equity Holdings, Inc. is excited to announce that its subsidiary, KBS Builders, has successfully signed two major contracts worth a total of $5.2 million. These contracts focus on the manufacturing of housing units, promising to contribute positively not only to KBS's growth but also to addressing the ongoing...

Continue Reading
Navigating the Startup Jungle: Break Free from Traps

Updated Category News Views 158

Understanding the Existing Market Trap A fresh approach from the creators of Play Bigger reveals the hidden costs startups face. The new book titled The Existing Market Trap: A Primer presents a timely exploration into why many startups struggle to gain traction. Co-authors Al Ramadan, Christopher Lochhead, alongside new contributors Jason Wellcome and Mary Gr

Continue Reading