The container has arrived on site, been set in place, fully connected to power and network infrastructure, and configured for immersion cooling. With the physical infrastructure complete and energized, the project has advanced into final engineering coordination for CPU integration and system commissioning.
https://finance.yahoo.com/news/envirotech-veh...00301.html