$YGTFF $YGT.V - "Unlocking Discovery -> This illustration displays a cross-section showing master hole GTCM24-056, from which numerous wedges of varying lengths are placed along to intersect the target area in depths shallower than that of the master hole. The first wedge is planned to start at 2,000-2,100 m downhole with a Campbell Shear target of 2,700 m, or 800 m below the Robertson shaft. Click to learn more about our 2025 drill program.