As we know from many PR's etc,of the 5 so far know
Post# of 8054
As we know from many PR's etc,of the 5 so far known veins discovered by 73 drill holes, they have been doing deeper drilling on and concentrating on the Coloso and Samson veins,which parallel each other from the west end of the mine as previously shown in graphics until the Samson crosses the Coloso and apparently goes north-which is where I think this overburden removal is. They discovered the Samson vein w the recent deeper drill holes. At least 4 large excavators seen here-is that the 375 on the right grajekk,plus presumably the almost as large cat 365 and the 2 recently acquired cat 330's-see Kubis excellent dd equipment post. Cat 375 alone would cost 1million new,and Cat 365 would be close if new. A couple dozers on far right and left. This alone in this pic is far more value of equipment than any other jr miner startup I know of and the only one w net income that I know of.