Brixton Metals Provides Assays; Drill Program at i
Post# of 37030
1467.73m of Copper-Gold-Silver-Molybdenum with Several Sub-intervals: 960.40m of 0.39% CuEq, 452m of 0.46% CuEq, 121.50m of 0.55% CuEq,8.0m of 1.21% CuEq and 64.73m of 0.61% CuEq.
Highlights
Copper dominant porphyry mineralization starts at 314.5m depth in hole THN24-290 which ended in mineralization at 1564m depth and remains open in all directions . Important higher-grade sub-intervals yield broad zones of Cu-Au-Ag-Mo mineralization.
Vice President of Exploration, Christina Anstey stated, “We are delighted to report on these exceptionally broad copper intervals from the initial drill results of our fully funded 2024 season at the Thorn Project.
We are looking forward to receiving results for two additional deep holes, 291 (assays pending) and 294 (currently drilling) at Camp Creek, which were planned as northwest step outs from previous drilling as well as three completed drill holes at the Cirque Copper Target (assays pending), located 3km east from the Camp Creek Target area.”
https://brixtonmetals.com/
BULLISH