Piedmont Lithium (PLL.NASDAQ) ....................
Post# of 394
Piedmont Lithium (PLL.NASDAQ) Carolina Lithium project, located in Gaston County, North Carolina
https://piedmontlithium.com/projects/carolina-lithium/
Assays
25.22m of cumulative thickness of mineralization across 6 pegmatites which includes high grade intercepts of 5.40m @ 1.46% Li2O, 2.65m @ 1.24% Li2O and 2.00m @ 1.43% Li2O in Hole 17-BD-73
21.92m of cumulative thickness of mineralization across 5 pegmatites which includes high grade intercepts of 8.86m @ 1.72% Li2O, and 8.04m @ 1.02% Li2O in Hole 17-BD-80
18.66m of cumulative thickness of mineralization across 6 pegmatites which includes high grade intercepts of 6.27m @ 1.39% Li2O, 4.21m @ 1.83% Li2O, 2.26m @1.52% Li2O and 1.68m @ 1.83% Li2O in Hole 17-BD-64
18.64m of cumulative thickness of mineralization across 6 pegmatites which includes high grade intercepts of 6.66m @ 1.59% Li2O and 2.68m @ 1.58% Li2O in Hole 17-BD-75
14.08m of cumulative thickness of mineralization across 5 pegmatites which includes a high grade intercepts of 5.03m @ 1.98% Li2O and 2.04m @ 1.52% Li2O n Hole 17-BD-70
12.97m of cumulative thickness of mineralization across 2 pegmatites which includes a high grade intercept of 10.36m @ 1.53% Li2O in Hole 17-BD-72
24.38m of cumulative thickness of mineralization across 3 pegmatites which includes high grade intercepts of 18.04m @ 1.01% Li2O and 1.99m @ 1.28% Li2O in Hole 17-BD-87
23.64m of cumulative thickness of mineralization across 5 pegmatites which includes high grade intercepts of 11.60m @ 1.29% Li2O, and 5.97m @ 1.14% Li2O in Hole 17-BD-77
22.82m of cumulative thickness of mineralization across 4 pegmatites which includes high grade intercepts of 9.74m @ 1.31% Li2O and 5.73m @ 1.36% Li2O in Hole 17-BD-98
21.86m of cumulative thickness of mineralization across 4 pegmatites which includes high grade intercepts of 13.95m @ 1.34% Li2O and 2.93m @ 1.41% Li2O in Hole 17-BD-95
15.69m of cumulative thickness of mineralization across 3 pegmatites which includes high grade intercepts of 11.09m @ 1.27% Li2O and 3.41m @ 1.20% Li2O in Hole 17-BD-90
12.51m of cumulative thickness of mineralization across 2 pegmatites which includes a high grade intercept of 10.55m @ 1.46% Li2O in Hole 17-BD-102
28.5m of cumulative thickness of mineralization (non-continuous) across 7 pegmatites which includes high grade intercepts of 6.2m @ 1.21% Li2O and1.4m @ 1.50 Li2O in Hole 18-BD-166
19.1mof cumulative thickness of mineralization (non-continuous) across 2 dikes which includes high grade intercepts of 8.3m @ 1.66%Li2O and 10.9m @ 1.05% Li2O in Hole 18-BD-174
20.9m of cumulative thickness of mineralization (non-continuous) across 3 pegmatites which includes high grade intercepts of 4.6m @ 1.44% Li2O and3.0m @ 1.35 Li2O in Hole 18-BD-176
18.4m of cumulative thickness of mineralization (non-continuous) across 7 pegmatites which includes high grade intercepts of 7.7m @ 1.23% Li2O and1.7m @ 1.52 Li2O in Hole 18-BD-177
24.0m of cumulative thickness of mineralization (non-continuous) across 6 pegmatites which includes high grade intercepts of 11.7m @ 1.23% Li2O and2.6m @ 1.45 Li2O in Hole 18-BD-180
21.3m of cumulative thickness of mineralization (non-continuous) across 3 pegmatites which includes high grade intercepts of 8.9m @ 1.36% Li2O and6.2m @ 1.34 Li2O in Hole 18-BD-194
17.7m of cumulative thickness of mineralization (non-continuous) across 4 pegmatites which includes high grade intercepts of 3.3m @ 2.38% Li2O and9.4m @ 1.65 Li2O in Hole 18-BD-204
21.8m of cumulative thickness of mineralization (non-continuous) across 5 pegmatites which includes high grade intercepts of 8.0m @ 1.62% Li2O and2.6m @ 1.88% Li2O in Hole 18-BD-208
47% increase in Piedmont Project-wide Mineral Resource estimate to 27.9 Mt @ 1.11% Li2O
55% increase in Mineral Resource estimate on Core property to 25.1 Mt @ 1.09% Li2O
74% of the Core property resource is within 100m of surface and 97% is within 150m of surface
100% of the lithium resource is attributed to spodumene mineralization
Core property Resource is based on 326 diamond coreholes totalling over 51,000 meters
9,450 meters of drilling remain in Phase 4 drill campaign with numerous highly prospective targets
PIEDMONT RAISES A$70 MILLION TO DEVELOP AMERICAN LITHIUM PROJECT
https://piedmontlithium.com/piedmont-raises-a...m-project/