Sean, as always answered very quickly. His reply follows
Update on Treaty Drilling:
We drilled the wells that were talked about in the December/January (I apologize the timing escapes me). That took place in January and in mid-February. There's been a lot of reshuffling and moving around with regards to how Treaty Drilling will be operating, some of which isn't finalized. However, the job that was discussed in the past were completed as mentioned. There are future drilling prospects coming up in the pipeline I've been told, but nothing too specific at the moment.
Also thanks for the complement. I'm glad that I could be of assistance. Please let me know if there's anything else I can do for you.