NetworkNewsBreaks – Eloro Resources Ltd. (TSX.V:
Post# of 136
Eloro Resources (TSX.V: ELO) (OTCQX: ELRRF) (FSE: P2QM) today provided an update on its ongoing preliminary metallurgical testwork program for the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. The ongoing work is being carried out by Blue Coast Research Ltd. (“BCR”) based in Parksville, British Columbia, and Mineral Concentration Laboratory of the National Faculty of Engineering from the Technical University of Oruro (“UTO”), Bolivia. “The Iska Iska silver-tin polymetallic deposit is a remarkably extensive system with multiple potential ore types, which require more metallurgical work than originally anticipated, especially for tin, as outlined in this press release,” said Tom Larsen, CEO of Eloro. “The preliminary metallurgical recovery estimates are a prerequisite for the release of the project’s maiden mineral resource (‘MRE’). Consequently, the release of the MRE has been delayed until this metallurgical work, which is in progress, has been completed. All other work required for the MRE has been largely completed by Micon International Limited, including much of the reporting.”
Please see full disclaimers on the NetworkNewsWire website applicable to all content provided by NNW, wherever published or re-published: http://NNW.fm/Disclaimer