“Astra conceived this unique Project to address two of Zanzibar’s most pressing issues: access to clean, reliable power and the growing problem of municipal solid waste disposal,” says Astra’s Vice President of Electrical Power Generation Tony Thompson. “The 50 megawatts of generation on Unguja, coupled with the BESS component, will drastically reduce the island’s reliance on a single 100-MW submarine cable from mainland Tanzania, which is currently its sole source of power and is routinely operated at greater than 90% of its capacity during periods of peak demand on the island. The Project’s consumption of 300 tons per day of MSW will reduce the stress on the Kibele landfill, the island’s only dedicated receptacle for waste.”