Could be the TECO needs the room but based on what
Post# of 39368
Could be the TECO needs the room but based on what BPD. Why can't anyone provide ongoing BPD. Is this some focking shell game? I have $30k invested here and I am no longer playing focking games with cryptic truck loads of oil that could have been collecting in tanks for months. Let's do some math:
The truck was only able to take the limited amount due to gravity and road conditions but since the truck took 170 barrels; TECO will have room for another 170 barrels or did you miss that part? Do you know the current BPD from these reworks? I can only assume it's still 25 BPD that was last mentioned. If that is still the case then 170 barrels of empty tank divided by 25 BPD gives them approx. 7 days before they replace todays pickup and would require another pick up. I don't get excited about 25 BPD being picked up and delivered to the refinery since increased BPD is all I care about. 25 BPD is awful considering how much money TECO has spent and how many years they've been running these reworks. I've been sober for 25 years so maybe I need to pick up a stout to have some rose colored perspective on the situation.