NetworkNewsBreaks – Vision Energy Corp.’s (VEN
Post# of 24
Vision Energy (OTCQB: VENG) recently entered into a corporation agreement with Linde Engineering to accelerate efforts for the company’s pioneering Green Energy Terminal in the North Sea Port of Vlissingen, the Netherlands. “Linde Engineering, a leading global industrial gases and engineering company with 2021 sales of $31 billion, will deliver preliminary Front-End Engineering and Design (‘FEED’) services to the project including design and engineering of 150,000 cubic meters (‘CBM’) of green ammonia (‘NH3’) storage, truck and barge loading facilities, ship loading and unloading facilities, as well as utilities, infrastructure and buildings… Vision Energy is in the advanced stages of planning the construction and delivery of Northwestern Europe’s first import, storage and handling terminal designed exclusively for hydrogen carriers, renewable energy products and low-carbon fuels. Total capacity under phase 1 is for up to 400,000 CBM including 150,000 CBM allocated to green ammonia, 180,000 CBM allocated to renewable methanol and 70,000 CBM allocated to biofuels,” a recent article reads. “Our Green Energy Terminal Project will accelerate and advance the energy transition and facilitate Northwestern Europe’s ambition to achieve Net Zero through carbon abatement and adoption of hydrogen as a core feedstock and fuel,” Vision Energy CEO Andrew Hromyk is quoted as saying.
Please see full disclaimers on the NetworkNewsWire website applicable to all content provided by NNW, wherever published or re-published: http://NNW.fm/Disclaimer