$FUSEF In the fall of 2017, Fuse completed 21 diamond drill holes totalling 1,913.50 m at Glencore Bucke in a first phase of drilling designed to confirm and extend the existing known mineralized zones on the property. The program tested the Main Zone for a strike length of approximately 55 m and the Northwest Zone for a strike length of approximately 45 m.(
https://www.l3opptrk.com/3J67C1/42176FM/