Hulk The point I have been trying to make is that
Post# of 148165
The point I have been trying to make is that we are adding horsepower to something that is already at the finish line.
If us is true that the CMC section of the BLA is going in by early September then it should be all but done at this point.
Hiring a new CMC section expert full time is like have two high horsepower cars (new hire and Dr. Ray) parked in the garage next to each other.
IMO