$SXOOF St-Georges Eco-Mining Corp. Drilling Progress: Drilling on Julie is currently underway. A first hole totalling 504 meters was completed. The drill rig has been moved to the second planned hole and at the time of this report, 3 meters of casing and 57 meters of core is already completed. The second hole located approximately 210 meters North-East of the Julie Showing has an azimuth of 325°, and a 55° down dip angle for a planned 500 meters length. Three additional holes are expected to be drilled in this first phase that should be followed by downhole geophysics.
https://backend.otcmarkets.com/otcapi/company...83/content