$AGYP Updates on Palo Pinto Pre-Production Activit
Post# of 36877
UPDATES ON PALO PINTO ACTIVITIES ("The Green Lease"
Allied Energy Operating LLC, ("Allied" submitted and posted their bond for the P-4 and P-5 applications to the Texas Railroad Commission, Allied is waiting on the Texas Railroad Commission to accept their bond and active the P5 operating permit.
Allied has secured Oil Cat Energy Services for the filing of the necessary Underground Injection Permit for saltwater injection for the Green lease. Allied will use Oil Cat Energy Services as the go-to solution for surveying the plat for the precise injection well location, for securing the drilling permit for the injection well, for engineering services and consulting, and workover engineering for new production well set ups for increased fluid production rates.
https://oilcatservices.com https://finance.yahoo.com/news/allied-energy-...00973.html