"How long should a Belize well physically take not including government red tape? IMO maybe three weeks at most."
Less than a week if were being drilled by a drilling contractor in the US. Three weeks is a good estimate, but just to be on the safe side you might want to double that in case they run into any logistical problems. If you figure 6 weeks, then you are less likely to be let down.