“I would hope that they are processing a progres
Post# of 148184
Same, but I’m confused by the difference between a interim analysis at 50% enrollment and vs a periodic safety review conducted by a DSMC (which is what CYDY will be doing next week). Is. A progressive analysis of the other endpoints part of the safety review, or is it just deaths and other SAEs?