Had to move off the Container Dock 2 for in-coming
Post# of 8059
Had to move off the Container Dock 2 for in-coming container vessel and over to Dock 1 where Vessel cranes are being used to load cargo with Pan-Dumps at 25mt each, 4 cranes. These pictures were taken as they were getting set-up this morning. First 3 hours they loaded 2,400mt.. Looks like we will be loaded and out before the next window at Dock 2, so no more moves..