If longs choose to ignore or dismiss simple facts, such as the exterior infrastructure, holding tanks, piping...having been removed. And those repairs themselves, coupled with the permitting prior and post installation will take much longer than three months. Then you are just wishful thinking. On top of that, this is the absolute worst time of the year for that type of work to be done timely. Our worst storm of the year is rolling in as I post.