Last year at this time it looked to me like the ma
Post# of 8054
Last year at this time it looked to me like the main bottleneck was going to be the loading situation at the dock. That is far from a problem right now imo. If they are allowed to load 24 hours/day we could get 2 ships a week out the door the size of the one that is loading now.. Trucking from the mine to the port is still going to be OK. With 35-40 trucks we could easily move 35- 40,000 tons to port per week, and not break a sweat. So now it just comes to how much do the buyers want and how much can we produce at the mine with the equipment we have. It wouldn't surprise me in the least to see close to $100 million in revenue yet this year..