Equinor ASA: Johan Sverdrup, the North Sea giant, is on

New Post Public Reply Private Reply Replies (0) Message Board
News Desk 2022
104
Equinor ASA: Johan Sverdrup, the North Sea giant, is on stream

Stavanger, Norway, 5 October 2019 -- On 5 October Equinor and the Johan Sverdrup partnership consisting of Lundin Norway, Petoro, Aker BP and Total, started production from the giant field in the North Sea, more than two months ahead of and NOK 40 billion below the original estimates in the Plan for development and operation.

“Johan Sverdrup coming on stream is a momentous occasion for Equinor, our partners and suppliers. At peak, this field will account for around one third of all oil production in Norway and deliver very valuable barrels with record low emissions. Johan Sverdrup is expected to generate income from production of more than NOK 1400 billion of which more than NOK 900 billion to the Norwegian state and society,” says Eldar Sætre, president and CEO of Equinor.

Johan Sverdrup has expected recoverable reserves of 2.7 billion barrels of oil equivalent and the full field can produce up to 660,000 barrels of oil per day at peak. Powered with electricity from shore, the field has record-low CO2 emissions of well-below 1 kg per barrel.

The break-even price for the full-field development is less than USD 20 per barrel. After reaching plateau for the first phase, anticipated during the summer of 2020, expected operating costs are below USD 2 per barrel. The operator also expects cash flow from operations of around USD 50 per barrel in 2020, based on a real oil price of USD 70 per barrel, partly as a result of the phasing of tax payments in the ramp-up phase.

High quality in execution, new technology and digitalization
“Starting production months ahead of schedule helps realize additional value from the field and is fitting for a project that over the development phase has redefined excellence in project execution,” says Anders Opedal, executive vice president for Technology, projects & drilling in Equinor.

The Plan for development and operation (PDO) for Johan Sverdrup phase 1 set an ambition for production start-up in late December 2019. Since the PDO was approved in August 2015, investment costs for the first phase of the development have been reduced by NOK 40 billion to now NOK 83 billion (nominal NOK, fixed exchange rate).

“Close cooperation with our partners and suppliers has contributed to high quality in the execution phase, and has been a key part of the improvement story. And we’ve also made courageous decisions with new technology and digitalization that we’re benefiting from today.”

“The qualification of new installations technology has reduced safety risk, saved more than two million offshore hours and shaved months of the development schedule. We have also invested in digital solutions and ways of working to boost oil recovery, optimize production and improve field operations, and these new ways of working have already saved at least one month in the execution stage,” says Opedal.

The largest development in Norway for three decades
Sanctioning of Johan Sverdrup in 2015 led the way to the largest development on the NCS since the 1980s. The first phase of the development has taken above 70 million manhours, and more than 12.000 people worldwide worked every day during the main construction period 2016-2018.

“Johan Sverdrup is a giant development, built across nearly 30 construction sites in Norway and globally, and the field centre assembled in the North Sea counts as one of the largest on the NCS. Sanctioned right at the beginning of the downturn in the oil and gas industry, it helped ensure activity for tens of thousands of people, especially in Norway, at a critical time for many,” says Opedal.

More than 70 percent of the contracts were awarded to suppliers in Norway, in strong international competition. The consultancy Agenda Kaupang has estimated that the Johan Sverdrup development can contribute more than 150,000 man-years in Norway during the construction phase between 2015-2025.

Activity and ripple effects on the NCS for decades to come
In the operations phase expected to last more than 50 years, Johan Sverdrup may also generate employment of more than 3,400 man-years on average every year.

“The field will be operated from Equinor’s offices in Stavanger, whereas base and helicopter services will be delivered from Dusavika and Sola. The oil transported from the field will also sustain activity at the Mongstad terminal outside of Bergen, and the gas will be exported to Kårstø,” says Arne Sigve Nylund, executive vice president for Development & production Norway. “The importance of this field for both the national and regional economies in Norway cannot be overstated.”

“In the same year that Norway celebrates 50 years since the Ekofisk discovery in 1969, which started the oil and gas adventure in Norway, the start-up of Johan Sverdrup lays the foundations for another 50 years of industrial activity and value-creation on the NCS”, says Nylund.

The Johan Sverdrup field is developed in two phases. Phase II of the development was approved by Norwegian authorities in May 2019 with production start-up expected in Q4 2022.

Media contact:

  • Lise Andreassen Hagir, Email: lhagi@equinor.com, Tel: +47 41657507

* * *

FACTS ABOUT JOHAN SVERDRUP

  • Johan Sverdrup is the third largest oil field on the Norwegian continental shelf, with expected resources of 2.7 billion barrels of oil equivalent.
  • At plateau the field will produce up to 660,000 barrels of oil per day, which will make up about one-third of oil production on the NCS.
  • Break-even price for the full-field development is below USD 20 per barrel. After reaching plateau for the first phase, anticipated during the summer of 2020, expected operating costs are below USD 2 per barrel.
  • Estimates from 2018 showed that the combined income from production from Johan Sverdrup amounts to 1430 billion NOK (2018) over the life of the field. Income to the Norwegian state is expected to amount to more than 900 billion NOK (2018), from taxes and from the Norwegian state’s ownership of Petoro.
  • The Johan Sverdrup field is powered with electricity from shore. CO2 emissions from production of oil and gas from Johan Sverdrup are estimated at 0.67 kg CO2 per barrel. CO2 emissions reductions from the field due to power from shore are estimated at more than 620,000 tonnes of CO2 per year, totaling more than 25 million tonnes of CO2 over the life of the field. After 2022, Johan Sverdrup will also provide power from shore to other fields on the Utsira High, including Edvard Grieg, Ivar Aasen and Gina Krog.
  • The Johan Sverdrup field is developed in two phases. Phase 1 was approved by Norwegian authorities in 2015 and came on stream in October 2019. Phase 2 of the development was approved in 2019 and is expected to start production in Q4 2022.
  • PARTNERS: Equinor: 42.6% (operator), Lundin Norway: 20%, Petoro: 17.36%, Aker BP: 11.5733% and Total: 8.44%.

PHASE 1

  • Included the development of four platforms (accommodation and utility platform, processing platform, drilling platform, riser platform), three subsea installations for water injection, power from shore, export pipeline for oil (Mongstad) and gas (Kårstø).
  • Contracts awarded in phase 1 amounted to more than NOK 60 billion. Over 70% of the suppliers had a Norwegian billing address.
  • Production capacity: 440,000 barrels of oil per day.
  • Capital expenditures: NOK 83 billion (nominal terms based on fixed currency).
  • Production start-up: October 2019.

PHASE 2

  • Includes development of another processing platform (P2), modifications of the riser platform and the field centre, five subsea templates, in addition to the power-from-shore supply to the Utsira High (including the Edvard Grieg, Ivar Aasen and Gina Krog fields) by 2022.
  • Contracts awarded so far in phase 2 amount to more than NOK 20 billion. 85% of the contracts have been awarded to suppliers in Norway.
  • Production capacity: 220,000 barrels of oil per day.
  • Capital expenditures: estimated at NOK 41 billion (nominal terms based on fixed currency).
  • Production start: Q4 2022 (expected).
Scroll down for more posts ▼

Top 10 Most Recent News Articles

ecozy's Brezzano Switch: Brewing Simplicity at Home

Updated Category News Views 288

Breathe the aroma, sip the innovation. ecozy just threw their Brezzano Switch into the arena, and here's the deal: it's a no-nonsense, get-your-caffeine-fix kind of machine aimed at making your mornings simple without compromising on flavor. Unique Features of the Brezzano Switch So, what's cooking? Get this—it's not just any coffee contraption. Built sleek and compact,...

Continue Reading
Paris Baguette Pioneers Drive-Thru in Oklahoma

Updated Category News Views 327

Tapping The Unseen Potential In Bakery Cafes Every so often a business move comes along that makes you sit up and say, "Why the hell haven't they done this before?" Paris Baguette has finally cracked that code, rolling out its first-ever drive-thru in Moore, Oklahoma. Now, imagine yourself zipping through for a croissant without leaving the comfort of your car seat. Makes...

Continue Reading
Aurora Innovation Faces Legal Heat Amid Delays

Updated Category News Views 102

Production Snags at Aurora Innovation Ah, investing – not for the faint-hearted. One day you're riding high, the next you're scraping by, and Aurora Innovation's (NASDAQ:AUR) investors just hit a rough patch. The autonomous trucking darling announced unexpected delays in its delivery schedule, sending shockwaves through its stock price and shaking investor confidence....

Continue Reading
Evaluating GLP-1 Telehealth? Key Questions to Consider

Updated Category News Views 238

Navigating the Landscape of GLP-1 Telehealth Providers In the sprawling jungle of telehealth options for GLP-1 care, it's easy to feel like you're drowning in sameness. Picture this: you land on a sleek page promising the moon and stars, but who knows what's behind the curtain? That's where seasoned advice comes in, like a compass in this murky digital forest. Meant, a...

Continue Reading
Muyuan Foods Spotlights Smart Farming at EuroTier 2026

Updated Category News Views 210

Muyuan Foods Ready to Impress at EuroTier 2026 Let's face it, folks—when you think of game-changers in pig farming, Muyuan Foods Group deserves a nod. They're not just trotting out oinkers left and right; they're steering the whole paddock with innovations in smart pig farming and green development solutions. At EuroTier 2026 in Hanover, Muyuan’s booth—J04 in Hall...

Continue Reading
JOYEE N01 Kicks Off Global Launch with African Orders

Updated Category News Views 230

A New Chapter for JOYEE N01 There's a moment in every company's life when it either steps boldly into the future or stumbles back into obscurity. For FAW Bestune, October 28, 2026, was one of those defining moments. On this day, they launched global mass production of the JOYEE N01 in Yancheng, China. And boy, did they pull out all the stops—you don't see this kind of...

Continue Reading
J&J's New Study: Sjögren’s Solution Insight Sparks Debate

Updated Category News Views 138

Patient-Centric Take on Sjögren's Disease Johnson & Johnson has dropped fresh Phase 2 results on nipocalimab, reminding everyone they're at the helm of reshaping treatments for Sjögren's disease (SjD). A condition leaving about four million folks craving better days, in multiple ways, shines a light on what's gripping patients the hardest. It's hard not to sit up and...

Continue Reading
7th World Media Summit Spotlights Media's Future in Beijing

Updated Category News Views 140

The Changing Landscape of Global Media An event of this magnitude doesn't just pop up every day like a stock ticker on Wall Street. This year's 7th World Media Summit in Beijing is where nearly 500 bigwigs from all corners of the media landscape are converging. It's not about trading stocks or hitting quarterly numbers—it's about shaping how stories get told in an era...

Continue Reading
Moon Base Ambitions: Impulse Space Wins Key NASA Contracts

Updated Category News Views 263

NASA's Vision and Impulse's New Role Ever think you'd see a company like Impulse Space set to play a starring role in humanity's return to the lunar surface? Well, strap in because this isn't just a pipe dream anymore. NASA's bold plan to establish a Moon Base has taken a tangible step forward with Impulse winning two hefty task orders. This ain't just peanuts—this duo...

Continue Reading
Adding Fireplaces: Home Comfort or Construction Headache?

Updated Category News Views 175

Sizing Up the Installation Options Slapping a fireplace into a home sounds more like a pipe dream than a practical project for most folks. But according to fireplace whiz Jimmy Smith down in North Charleston, the times are a-changin'. These days, with advances in technology, homeowners can actually pull it off without collapsing their living room walls. Nitty-Gritty:...

Continue Reading

Top 5 Most Recently Viewed Articles

Revamping Ontario's Rental Housing Market for Fairness

Updated Category News Views 530

Challenges in Ontario's Rental Housing Market Ontario's rental housing market faces significant challenges. Many families, students, and seniors are finding it increasingly difficult to locate safe and affordable homes. The situation has become critical, prompting urgent calls for reform to the existing rental system. Need for Modernized Rental Laws The Ontario Real...

Continue Reading
LUB Liquidating Trust Announces $0.25 Cash Distribution

Updated Category News Views 131

LUB Liquidating Trust Declares Distribution of $0.25 Per Unit LUB Liquidating Trust, also known as the Trust, has made a significant announcement regarding its financial activities. Recently, the Trust declared a cash liquidating distribution of $0.25 per unit. This amount will be paid to unitholders of record on a specified date in the near future. The Trust was formed...

Continue Reading
DexCom, Inc. Faces Legal Challenges: Shareholders Urged to Act

Updated Category News Views 170

DexCom, Inc. Under Legal Scrutiny Investors holding shares in DexCom, Inc. (NASDAQ: DXCM) should act swiftly as the company faces significant legal challenges. A federal securities class action lawsuit has been initiated against the Company and several of its executives due to potential violations of federal securities laws concerning the company’s continuous glucose...

Continue Reading
Arelion Unveils New Resilient Connection Route in the Baltics

Updated Category News Views 185

Arelion's Latest Investment in Baltic Connectivity Arelion recently announced significant developments in its network aimed at improving connectivity in the Baltic region. By constructing a high-capacity, diverse route between Helsinki and Warsaw, the company is creating a robust and resilient infrastructure that will enhance the flow of digital traffic across multiple...

Continue Reading
Wellen Park Expands with New Parks and Nature Trails

Updated Category News Views 458

Wellen Park Expands Outdoor Opportunities with New Parks Wellen Park is taking significant steps towards enhancing its outdoor recreational offerings. This thriving master-planned community is set to introduce three new parks along with approximately 10 miles of scenic nature trails. These additions aim to boost the outdoor experience for residents and visitors alike,...

Continue Reading