The PRs are obviously delayed from when events happen.
Test gold was done July 30th and PR was Aug. 12. In that same PR they said additional ore had been loaded to the tune of 4000 tons @ 2.8 g/t on top of the 2500 tons of low grade call it .6 g/t.
I don't really think they waited till Aug 14th to start leaching again. This should then give them a full month of leaching on that pad with a pour by Sept. 1.
Now math wise I might be doing this wrong and actually I know I am. Just going off those numbers I'm thinking around 250oz is gonna be poured.
4000*2.8=11200
2500*.6=1500
12700g/31=409oz
409*70%recovery = 286oz gold.