Anyone know how much ore is on the second pad that started leaching? Is it possible that it’s another 2500 tons and the plan is to alternate 2500 tons on each pad, loading weekly? Because test pad size loads with 5-7 ounces per leach cycle even doubled with two pads is not going to make much of a dent in the PPS. It will hardly cover overhead.
Am seriously hoping they have loaded much more on pad #2