A glimpse on what we will be working with.....
Post# of 39368
A glimpse on what we will be working with.....
This is a major step forward in Treaty drilling and we definitely want it to go right. I know many of us want the drilling to start yesterday. There are many preparations to be made when moving and setting rig like #7. I'd say it's over 20 truckloads to move the rig without the support.
We are looking at many supplies that have to be brought in besides the rig itself. This is major operational undertaking.
I'm in full contact with management and the project is moving along as quickly as possible.
There is a 10 man crew that operates this rig and I can't wait to see it in action.
http://www.pistoldrilling.com/Rig7Pic1.html
http://www.pistoldrilling.com/Rig7Pic2.html
http://www.pistoldrilling.com/Rig7Pic3.html
http://www.pistoldrilling.com/Rig7Pic4.html