March 11th, tweet: “Meetings in Detroit went gre
Post# of 40989
With the date given, the earliest the test could have started would be March 18th. A 3-week test period would conclude on April 8th, at the earliest. At most only 91 calendar days, (61 days excluding weekends and holidays), have passed since the end of the test period. There was also a tweet on March 26th, stating Jenkins was back in Detroit.
With the wording in the tweet, “a new 3-week private label test”, indicates that this is a continuation of the test that was announced in an August 20th, tweet regarding Detroit. I assume after the test back in September Detroit liked the product enough to continue talks, but not enough to purchase. The 3-week test began after Berman announced that new features were added to the bSafe product.
Same goes for Charlotte. From a March 19th, tweet; “Charlotte going great another private label test run”. Testing was occurring in the same approximate time frame as Detroit.
In my opinion, both Detroit and Charlotte are very much in play.
May 13th, tweet: “hopefully huge announcement coming in the next few days have a verbal waiting for a written confirmation asap this will be a game changer I will report asap everyone will be very happy”.
I have checked all PR’s and tweets since the above was announced. I couldn’t find anything that can relate to the tweet. There has been some good news and some interesting news, but no game changing news that required written confirmation of a verbal before releasing. So, we’re still waiting for the news to drop. Could be Detroit, Charlotte, the A/1, or something shareholders have been kept oblivious to. Eager for this news to drop.