Convocation of Extraordinary General Meeting of

New Post Public Reply Private Reply Replies (0) Message Board
News Desk 2022
31
Convocation of Extraordinary General Meeting of Shareholders of LITGRID AB

Based on the initiative and decision of the Board of LITGRID AB (company code 302564383, registered office address A. Juozapavičiaus g. 13, Vilnius, total number of ordinary registered shares issued - 504 331 380), an extraordinary meeting of LITGRID AB shareholders is called on 12 March 2019, at 10.00 am. The meeting will take place in company Room 226, A. Juozapavičiaus g. 13, Vilnius. The registration of shareholders starts on 12 March 2019, at 9.30 a.m. The registration of shareholders ends on 12 March 2019, at 9.55 a.m.

The record date of the extraordinary general meeting of shareholders has been set for 4 March 2019. The right of participation and voting in the extraordinary general meeting of shareholders can be exercised only by the persons who remain shareholders of LITGRID AB by the end of the record date of the extraordinary general meeting of shareholders.

Agenda of the general meeting of the shareholders and draft decisions proposed:

Concerning approval of the decision by the Board of LITGRID AB dated 15 February 2019.

Decision proposed:

In accordance with the clause 7.12.3.7. of the Articles of Association of LITGRID AB, to approve the decision by the Board of LITGRID AB dated 15 February 2019 as follows:

1. To approve creation of a fixed asset (Expansion of the Litpol Link interconnection, I Stage), and enter into a contract of purchase of design and construction works with „Žilinskis ir Co“ UAB (company code: 304317232, registered office address: Užtvankos g. 17, Dainių k. Jurbarko raj.); accepted contract value (excl. VAT) is EUR 21 647 000.00, and EUR 26 192 870.00 (incl. VAT).

2. Key conditions of the contract of purchase of Environmental Impact Assessment, Design and Construction Works of the I Stage of Expansion of the Litpol Link Interconnection shall be approved as follows:

2.1. General conditions shall be the Conditions of Contract for Plant and Design-Build for Electrical and Mechanical plant, and for Building and Engineering Works, designed by the Contractor (Yellow Book), first edition 1999 (second revised edition in Lithuanian 2007), issued by the International Federation of Consulting Engineers ( Fédération Internationale des Ingénieurs-Conceils , FIDIC).

2.2. The scope of the Project (Object ant Subject of the Contract): Stages of the contract – the Contractor undertakes to carry out the works of the I stage Expansion of the Alytus converter station (Project).

The Subject of the contract: 400/330 kV autotransformers will be installed in the Alytus converter station to ensure transmission capacity of at least 1,800 MVA, and the expansion works of Alytus 400 kV and 330 kV switchyards will be performed, power lines installed and rearranged, and Alytus 400 kV switchyard internal power supply rearranged, expanding LitPol Link interconnection and ensuring technical measures of connecting Polish and Lithuanian power systems for operation in emergency synchronous mode  (all together in the Contract – the Object).

The Contract falls in three stages:

Stage I – to perform the procedures of environmental impact assessment of the planned economic activity which the Object is subject to, and to receive the screening conclusion regarding the environmental impact assessment;

Stage II – to prepare the Technical Design and to receive construction permit for the Object

Stage III – to prepare the detailed design of the construction works of the Object, to execute and complete the construction works of the Object, including successful performance of all tests, to receive the Construction Completion Certificate and to submit it to the Employer.

2.3. The type of the contract – the contract for environmental impact assessment, design and construction works.

2.4. The terms of the Contract – project must be completed until December 31 of 2020. The Contract also includes liability of the Contractor during warranty period.

2.5. Contract performance guarantee – the Contractor must submit to the client: (A) the contract performance guarantee. Contract performance shall be secured by a first-demand, unconditional, and irrevocable guarantee to be issued by a bank. Contract performance security is set at 10% based on the initial price of the Contract.

2.6. Contract pricing and price - the amount of the contract for the whole project will be fixed.

Each stage of the Contract will have its own fixed price - the Agreed amount. The price for each stage will be paid in separate parts, the amount of which is fixed in the annex to the Contract as a percentage of the agreed total amount. Payments are linked to achieved milestones. Payment schedules will be laid out in annex to the Contract. Pricing rules will accompany the Contract as an annex.

2.7. Payment procedure – payments will be made according to the payment list. Term of the payment – 30 days after the Contractor submits VAT invoice via information system “E.sąskaita”. All payments are made in Euros.

2.8. Advance payment – the Contractor will have the right to receive advance payments - 5% of agreed Contract amount with a condition that the Contractor submits first-demand, unconditional, and irrevocable bank guarantee equal to the amount of advance payment and Contract performance guarantee.

General Liability Limits The following limits will apply to the liability of the Parties for direct losses under the Contract: (A) The total liability of the Contractor shall not exceed 100% of the Contract Price; (B) The Contractor's liability for delays shall not exceed 10% of the Contract Price; • The total liability of the Client shall not exceed 100% of the Contract Price. • Penalty for delay in submitting a program – EUR 5 000 fine for late submission of the initial program. • A fine of EUR 100 for each delayed day when the updated program is delayed. • The total liability for delays in submitting a program or updated program may not exceed EUR 10,000. • Delinquency Compensation – for Delay in Stage I - 0.04% of Agreed amount of the Contract for Phase I for each day paid in Euro. • Delay in Stage II - 0.04% of the Agreed amount of the Contract for Phase II for each day paid in Euro. • For missing a Critical Date by which the Contractor is required to provide the Customer with the Final Technical Solutions - 0.04% of the Agreed Amount of the Contract for the entire Project for each day paid in Euro. • Delay in Stage III - 0.04% of the Agreed amount of the Contract for the entire Project for each day paid in Euro.                                               The shareholders can get familiar with the documents related to the agenda of the meeting, draft decisions and general ballot paper on work days in the premises of LITGRID AB, at A. Juozapavičiaus g. 13, Vilnius, room 141, during the office hours of the company (from 7.30 a.m. to 11.30 a.m. and from 12.15 p.m. to 4.30 p.m., on Fridays from 7.30 a.m. to 11.30 a.m. and from 12.15 p.m. to 3.15 p.m.). These documents and other information that should be published in accordance with the laws relating to the shareholders’ right to propose to supplement the agenda of the meeting, propose draft decisions with respect to the items of the agenda and the shareholders’ right to submit questions in advance to the company with respect to the items of the agenda of the meeting shall also be placed on the company’s website at http://www.litgrid.eu.

If a shareholder holding voting rights or a proxy duly authorized thereby makes a request in writing, the Company shall draw and send by registered mail, not later than within 10 days prior to the general meeting of shareholders, the general ballot paper or shall serve it on the shareholder personally against acknowledgement of receipt. The general ballot paper is also available on the Company’s website at http://www.litgrid.eu. A general ballot paper completed and signed, and a document attesting the voting right may be sent to the Company by registered mail or delivered to the Company at its address at A. Juozapavičiaus g. 13, Vilnius, until the close of business day (4.30 p.m.) of 8 March 2019.

The Company shall have the right to refuse to include the advance voting of the shareholder or a proxy thereof if the general ballot paper submitted does not comply with the requirements laid down in Article 30(3) and 30(4) of the Law on Companies of the Republic of Lithuania, if it has been provided late or has been filled out in a way that makes it impossible to identify the actual will of the shareholder with respect to the questions at stake.

A person taking part in the general meeting of shareholders and having the voting right shall present a document certifying his/her identity prior to the end of registration of shareholders to the general meeting of shareholders. A person who is not a shareholder shall, apart from a document certifying his/her identity, also present a document attesting his/her voting right.

Persons may vote in a general meeting of shareholders by proxy. A proxy holder shall have the same rights in the general meeting of shareholders as a shareholder represented by him/her unless the proxy provides otherwise. A proxy issued abroad shall be translated into Lithuanian and shall be legalized in the procedure established by law. The Company shall not establish a special form of a proxy.

The shareholders who have the right to take part in the general meeting of shareholders shall have the right to authorize, by electronic communication means, a natural person or a legal entity to take part and vote in their name in the general meeting of shareholders. This proxy shall not be certified by a notary. The Company shall acknowledge the proxy issued by electronic means of communication only in case where the shareholder signs it using electronic signature created using secure signature software and approved by the appropriate certificate valid in the Republic of Lithuania, i.e. if the security of transmitted information is ensured and the shareholder can be identified. The shareholder is obliged to notify the Company in writing about the proxy issued by the means of electronic communication sending it by e-mail at info@litgrid.eu until the close of business day (4.30 p.m.) of 8 March 2019.

No electronic communication means will be used for participation and voting in the general meeting of shareholders.

Attachments:

  1. Extract from the Board resolution of LITGRID AB dated 15/02/2019;
  1. General ballot paper.

The individual authorized by Litgrid AB to provide additional information:

 Jurga Eivaitė

Head of Communication Division

 phone. +370 613 19977

 e-mail: jurga.eivaite@litgrid.eu

Attachments

Scroll down for more posts ▼

Top 10 Most Recent News Articles

Continuous Insulation Market Grows, Hits $67.74B by 2031

Updated Category News Views 26

Market Trends and Key Drivers Imagine riding a slow but steady bull market in insulation—sounds mundane, but the numbers don't lie. MarketsandMarkets™ had the scoop, predicting the Continuous Insulation Market will balloon from USD 56.98 billion in 2026 to USD 67.74 billion by 2031, putting down roots with a 3.5% CAGR. Now, you and I both know that when real estate...

Continue Reading
Expedera Teams Up with Cadence for Edge AI Supercharge

Updated Category News Views 74

A New Power Couple in AI Expedera and Cadence have decided to stir up the edge AI waters with their latest collaboration. By linking Expedera's Origin™ Evolution NPU with Cadence's Tensilica NeuroEdge 130 AI Co-Processor, we're looking at a partnership that's hell-bent on redefining efficiency and performance in edge AI systems. Breaking Down the Collaboration This...

Continue Reading
Mesh Security Bolsters Team with Five Cybersecurity Experts

Updated Category News Views 23

New Blood in Cybersecurity: Mesh's Strategic Moves Ever felt like the cybersecurity world is in a constant game of catch-up? You're not wrong. In today's digital battleground, companies don't just need more tools—they need collective wisdom to bind it all together. And it seems like Mesh Security just caught onto that notion, stacking their deck with five new...

Continue Reading
Inventor Unveils Compact Energy Converter Design

Updated Category News Views 20

A Fresh Spark in Energy Conversion Every now and then, something comes along in the energy space that makes you scratch your head and think, "Why didn't someone cook this up sooner?" Today's head-turner is the STACK COOLER, HEATER AND GENERATOR I AND II, dreamed up by a forward-thinking inventor from Shiocton, Wisconsin. What sets this contraption apart, you ask? Well,...

Continue Reading
Cultural Tech Fusion: The Asia-Pacific Way Forward

Updated Category News Views 196

A High-Tech Twist on Traditional Culture You ever walk into a room and see a robot perform kung fu? I'll admit, it caught me off guard at first. But that's exactly what happened at the "Enduring Heritage, Harmonious Asia-Pacific" special exhibition in Shenzhen. With all the usual high-ranking execs and cultural bigwigs there, nobody expected a showcase where Wing Chun...

Continue Reading
Formation Unveils First Solana Tokenized Securities Venue

Updated Category News Views 53

Well, here we go. Formation Securities is setting sail on the high seas of blockchain, aiming to operate a tokenized securities venue (TSV) on Solana. This isn't your garden-variety launch—it's a bold leap into a newer, faster-paced world of trading. Sure, you’ve heard about blockchains before, but this operation marries the traditional rigmarole of the stock market...

Continue Reading
Mattamy Homes' Winning Streak: Top Workplace Once Again

Updated Category News Views 20

Mattamy Homes Strikes Gold Again in Tucson Amidst the desert landscapes of Tucson, Mattamy Homes has etched its name in the sands of workplace excellence yet again. This 2026 accolade marks the second consecutive year the company clinched the Tucson Top Workplaces title, conferred by Energage. For those keeping score, that's not just a streak—it's a testament to a work...

Continue Reading
West Virginia's Water Upgrade: AWK's Strategic Moves

Updated Category News Views 29

Building a Water Infrastructure with Purpose Well, they ain't just whistling Dixie down in Ranson, West Virginia. American Water's been busy putting their money where their mouth is with this new 816,000-gallon tank. When you look at the bigger picture, it ain't just about a shiny new water storage toy. Nah, this is about setting the stage for long-term resilience in the...

Continue Reading
Human Development Fund's Bold Partnership for Growth

Updated Category News Views 18

An Unusual Alliance with Far-Reaching Implications Every once in a while, a nonprofit steps up with a move that makes even the toughest investors take notice. This isn't some Wall Street ticker talk, sure, but it’s worth turning your chair toward the table. The Human Development Fund (HDF) has penned a strategic deal with the Islamic Development Bank (IsDB), putting its...

Continue Reading
Honeywell Faces Investor Scrutiny: Class Action Deadline Looms

Updated Category News Views 34

Clouds Gather Over Honeywell Aerospace Sometimes the storm clouds are about as subtle as an elephant in your garden. And that's precisely what's brewing over at Honeywell Aerospace, Inc. (NASDAQ: HONA) these days. November 23, 2026, looms large as the deadline for investors to jump on board with a class action tied to alleged missteps that caught everyone off guard. The...

Continue Reading

Top 5 Most Recently Viewed Articles

CMB.TECH Achieves Fleet Expansion and Revenue Growth

Updated Category News Views 270

CMB.TECH Provides Insightful Trading Update CMB.TECH NV (NYSE: CMBT) has made notable strides in its fleet rejuvenation and overall operational performance. The company has successfully executed its strategy by selling two older vessels and adding five newbuild vessels to its fleet. Fleet Update Recent Deliveries As part of its aggressive fleet renewal plan, CMB.TECH...

Continue Reading
Skanska's Project: Transforming Franklin with a New City Hall

Updated Category News Views 144

Skanska Undertakes New City Hall Project in Franklin In an exciting development, Skanska has received a contract to build a state-of-the-art City Hall in Franklin, Tennessee. Valued at USD 53 million, equivalent to about SEK 520 million, this project aims to create a modern governance space that enhances public service. Constructing a Modern Civic Space The new City Hall...

Continue Reading
Peabody Energy Hit by Class Action Over Coal Mine Missteps

Updated Category News Views 36

A Sudden Unraveling at Peabody Drama unfurls in the coal sector, and it's Peabody Energy Corporation (NYSE: BTU) that's caught in the tempest. This big player in the coal game is tangled up in a securities class action lawsuit that's got investors buzzing. The furor stems from recent revelations that the company’s crown jewel, the Centurion mine, didn’t quite deliver...

Continue Reading
Partner Climbs 25 Spots on ENR's Environmental Firm List

Updated Category News Views 122

A Leap Forward in Environmental Expertise Alright, folks, let's dive into some real grit. Partner Engineering and Science, Inc. has pulled off a neat little trick. They've jumped up 25 spots on the 2026 Engineering News-Record's Top 200 Environmental Firms list. They’ve been making this list for 14 years straight, and that's no fluke. It's a hard road, especially when...

Continue Reading
Exploring the Recent Investment Activity in Delta Air Lines

Updated Category News Views 182

Investment Trends Surrounding Delta Air Lines Recent financial activities indicate a significant bullish sentiment surrounding Delta Air Lines (NASDAQ: DAL). An analysis of options history reveals that a notable number of unusual trades have occurred, which can provide insights into investor sentiments and market movements. Understanding the Options Dynamics According to...

Continue Reading