Yes. In the 8K, Co-Packer details great hearing this: "Productions
runs are to be scheduled on the 15th of each month, with a rolling 3 month production schedule to be provided with each monthly schedule."
here we go!
its coming.
(11)
(0)
Rocky Mountain High Brands, Inc. (RMHB) Stock Research Links