SHALA HYDROPOWER PLANT WITH DAM AND LARGE RESERVOIR POWER = 83.5 MW
Detailed description of the project
The installed power specified by calculating the river flow, is expected to be 83,450 kW, with an electricity output of about 321,465,632 kWh. The amount of Fees offered for concessions is 2.1% (6.750.778 kWh) and the time of implementation of the works 36 months. Value excluding VAT is 11,239,204,263 Lek.
The interest for hydropower utilization is for the Shala River waters, between the quotas 486 meters above sea level up to 176.00 meters above sea level, which is also the maximum quota of the Komani reservoir, respecting the technical conditions of design and non-violation of objects that are planned to be built in this watershed.
The Shala River on which is planned to build the hydro power plant is one of the Drini River branches that supplies the Drina cascade, which is the most important energy project in the country, providing over 90% of the energy in the country.
Project Details
Name of client: FALAK PROPERTIES LLC & SHALA ENERGY PLC
Country: Albania
Proportion carried out by legal entity (%): 100%
No of staff provided: 14
Type and scope of services provided
Project description analysis and the definition of the project highlights;
Hydrology Report
Sedimentation Report Seismology Survey and Report
Bore Holes, Sampling and
Geology and Geotechnical
Storage Reports and Permission
Gird connection design;
Explosive and Material Storage Study and Permission;
Aggregate Quarry Report and Permissions;
Final Design;
Detailed Design
Hydraulic Calculations;
Static Calculations;
Reinforcement Calculations;
Seepage Analyses;
Stability Analyses;
Tunnel / Conduit Calculations
Penstock Calculations;
Surge Tank Calculations
Dynamic Calculations;