$IDVV has placed orders and has taken delivery of the power system (Canna Power) and shipping containers as well as Electrical equipment for the build. The 1st OGGL’s will roll off the production floor in late July and be field installed by August. IDVV has opened production facilities in Southern California and is ramping up production of both the Long OGGL (40 ft) and the Short OGGL (30Ft) systems; to help Manage this IDVV has engaged Voltage River and Konstruct Builders to oversee the build outs and ensure proper quality control (QC) of each OGGL.
(0)
(0)